ABSTRAK

 

Analisis Eksergi pada pembangkit listrik tenaga uap perlu dilakukan untuk menganalisis Eksergi serta memberikan informasi untuk meningkatkan nilai efisien pada Air Heater. Penelitian dilakukan dilab Enegi Program Studi Teknik Mesin Universitas Ibn Khaldun Bogor. Alat yang digunakan yaitu : preassure gauge, preassure transmiter, pompa, Gas analyzer, Solenoid valve, Expantion joint, Expantion joint, Computer personal. Dan bahan : Tube Sheet, Tube, Deeflacting, Baffle, Hopper. Analisa Eksergi Air Heater yaitu menghitung nilai Hot Steam dan Cold Steam, dilanjut dengan menentukan nilai Availability Exergy, Availability Work dan Eksergi loss. untuk mengetahhui nilai Eksergi loss yaitu dengan menjumlahkan terlebih dahulu dari nilai yang sudah dihitung yaitu,  nilai Availability Exergy dan Availability Work. Setelah mengetahui nilai dari Availability Exergy, Availability Work dan Eksergi loss maka dapat menentukan nilai efisiensi. Nilai keluaran dan masukan pada Air Heater Hot Stream sebesar 662,86 kJ/kg, Cold Stream sebesar 568,48 kJ/kg, Availability Exergy sebesar 101582,96 KW, Availability Work  sebesar 44345,33 KW, vailability Work  sebesar 47927,38 KW, Eksergi loss sebesar  KW. Dan efisiensi yang didapat yaitu sebesar 79%.

 

Kata kunci :  Air Heater; analisis eksergi; efisiensi

 

ABSTRACT

 

Exergy analysis in steam power plants needs to be done to analyze the exergy and provide information to increase the efficient value of the air heater. The research was conducted in the Enegi Lab in the Mechanical Engineering Study Program at the University of Ibn Khaldun Bogor. The tools used are : preassure gauge, preassure transmiter, pompa, Gas analyzer, Solenoid valve, Expantion joint, Expantion joint sealing, Computer personal. Dan bahan : Tube Sheet, Tube, Deeflacting, Baffle, Hopper. Air Heater Exergy Analysis is calculating the value of Hot Steam and Cold Steam, followed by determining the value of Availability Exergy, Availability Work and Exergy loss. To find out the value of exergy loss, that is by adding up in advance the calculated value, namely the availability of Exergy and Availability Work. After knowing the value of Availability Exergy, Availability Work and Exergy loss, it can determine the value of efficiency. Output and input values at Hot Stream Air Heater of 662.86 kJ / kg, Cold Stream of 568.48 kJ / kg, Availability Exergy of 101582,96 KW, Availability Work  of 44345,33 KW, vailability Work  of 47927,38 KW, Exergy loss of 9310.25 KW. And the efficiency obtained is 79%.

 

Keywords : Air Heater; exergy analysis; efficiency.

Author Biography

Asep Hidayat Thullah, Universitas Ibn Khaldun Bogor

Mahasiswa S1 Teknik Mesin Universitas Ibn Khaldun Bogor

References

Aries Karyadi, C. R. (2016). Analisa Energi Dan Eksergi Pembangkit Listrik Tenaga Uap. 1–9.

Cangel Yunus A. And Michael A. Boles. (2002) "Thermodynamics and Enggineering Approach” Third Edition. McGraw-Hill Inc

Heri, J. (2015). Analisis perhitungan efisiensi gas air heater di pltu cirebon.

Hilga, J. N., Denny, M. S., & Haryanto, R. (2014). PENGARUH PERUBAHAN BEBAN TERHADAP SISTEM UAP EKSTRAKSI PADA DEAERATOR PLTU TANJUNG JATI B UNIT 2. 10(3), 94–98.

Nasruddin, P. S. (2015). Analisa Energi , Exergi dan Optimasi pada Pembangkit Listrik Tenaga Uap Super Kritikal 660 MW. 7–8.

PLTU Bukit Asam Palembang. (2017). Air heater unit 3 & 4 pltu bukit asam.

Sinaga, R. D. (2015). Analisa Pemakaian Air Heater Terhadap Peningkatan Efisiensi Boiler Unit 3 PLTU PT. PLN (Persero) Sektor Belawan.

Ulum, Bahrul, Nurrohman, Ambrita, E, Gaos, Y. (2017). Energy and Exergy Analysis of Mount Salak Geothermal Power Plant Unit 1-2-3.

Wildan tajudin & teguh hady. (2015). Evaluasi Kinerja Rotary Air Preheater dengan Metode ε-NTU pada Pengaruh Sudut Seal. 14–17.

Published

2022-07-28

How to Cite

Thullah, A. H., Gaos, Y. S., & Wiradinata, I. (2022). Analisis Eksergi Air Heater Pada PLTU Batu Bara 65 MW Bukit Asam. ALMIKANIKA, 4(3), 123–128. https://doi.org/10.32832/almikanika.v4i3.7132

Issue

Section

Articles