Analysis of Factors Affecting Labor Productivity in Fixing and Formwork Work on the Joglo Fly Over Rail Project

Authors

  • Muhammad Khalid Hasyim Azhari INDONESIA
  • Tsulis I’qbal Khairul Amar INDONESIA

DOI:

https://doi.org/10.32832/astonjadro.v13i3.15783

Keywords:

labor; productivity; influential; factors; productivity.

Abstract

The study investigates factors influencing worker productivity in construction projects, recognizing the challenge of balancing a sufficient workforce without compromising efficiency. Employing work sampling and regression analysis, eight variables are identified: experience, education, health, family dependents, wages, field conditions, weather, and K3. The results reveal that, collectively, these variables fall below established standards, indicating a lack of significant impact on labor productivity. Notably, experience emerges as the most influential factor, although its significance level remains below the threshold. Despite this, the variable's calculated t value of 1.772 suggests its relative importance compared to others. The study underscores the need for meticulous labor selection, emphasizing experienced individuals to enhance overall productivity. While no single variable surpasses the significance threshold, the findings provide valuable insights for construction project management, urging a focus on experienced workers to improve productivity levels. Ultimately, the study contributes to understanding the nuanced dynamics of worker productivity in construction, urging practitioners to consider experience as a pivotal factor in their labor selection process.

Author Biographies

Muhammad Khalid Hasyim Azhari, INDONESIA

Civil Engineering Department, Universitas Muhammadiyah Surakarta

Tsulis I’qbal Khairul Amar, INDONESIA

Civil Engineering Department, Universitas Muhammadiyah Surakarta

References

Anif, B. (2021) ‘Construction Project Productivity in Indonesia’, American Research Journal of Business and Management, 7(1), pp. 1–8. Available at: https://doi.org/10.21694/2379-1047.21001.

Abdillah, Novia Nur; Lestariningsih, M. (2023). PENGARUH SELF EFFICACY DAN PROFESIONALISME KERJA TERHADAP KINERJA KARYAWAN , DIMEDIASI MOTIVASI KERJA PADA PT PEGADAIAN CABANG WONOKROMO KOTA SURABAYA Novia Nur Abdillah Marsudi Lestariningsih Sekolah Tinggi Ilmu Ekonomi Indonesia ( STIESIA ) Surabaya.

Budi. (2022). Kemenhub Mulai Bangun Rel KA Layang Terpanjang di RI. 21–24.

Dixit, S. (2021) ‘Impact of management practices on construction productivity in Indian building construction projects: An empirical study’, Organization, Technology and Management in Construction, 13(1), pp. 2383–2390. Available at: https://doi.org/10.2478/otmcj-2021-0007.

Christy, Y.-, Setiana, S.-, & Cintia, P.-. (2018). Pengaruh Komitmen Organisasional Dan Budaya Organisasi Terhadap Organizational Citizenship Behaviour. Jurnal Akuntansi Maranatha, 10(2), 199–211. https://doi.org/10.28932/jam.v10i2.1085

Dewi, S. K., & Sudaryanto, A. (2020). Validitas dan Reliabilitas Kuesioner Pengetahuan , Sikap dan Perilaku Pencegahan Demam Berdarah. Seminar Nasional Keperawatan Universitas Muhammadiyah Surakarta (SEMNASKEP) 2020, 73–79.

Didik, P. (2018). Uji Validitas dan Realibilitas Step Test Sebagai Alat Ukur Keseimbangan Pada Lansia | Didik Purnomo, hlm. 53-70 53. 2(2).

Firdausya, F. A., & Indawati, R. (2023). Perbandingan Uji Glejser Dan Uji Park Dalam Mendeteksi Heteroskedastisitas Pada Angka Kematian Ibu Di Provinsi Jawa Timur Tahun 2020. Jurnal Ners, 7(1), 793–796. https://doi.org/10.31004/jn.v7i1.14069

Haniah, N. (2013). Uji Normalitas Dengan Metode Liliefors. Statistika Pendidikan, 1, 1–17. http://statistikapendidikan.com

Maria Sintorini, M., & Putra, H. (2016). Analisis Risiko Bahaya Kimia Pada Area Stock Fit Industri Sepatu, Pt Pratama Abadi Industri, Tangerang, Indonesia. Indonesian Journal of Urban and Environmental Technology, 6(2), 53. https://doi.org/10.25105/urbanenvirotech.v6i2.701

Muhfiyanti, Mulyadi, D., & Aimah, S. (2021). 3 1,2,3. 8(1), 327–334.

Rauzana, A. (2016). The effect of the risk factors on the performance of contractors in Banda Aceh, indonesia. ARPN Journal of Engineering and Applied Sciences, 11(15), 9496–9502.

Sabena, A., Hamdani Harahap, R., & Tarigan, U. (2016). Pengaruh Motivasi Kerja dan Kepuasan Kerja terhadap Peningkatan Produktivitas Kerja Karyawan. Jurnal Administrasi Publik : Public Administration Journal, 6(2), 137. https://doi.org/10.31289/jap.v6i2.1329

Suriyanti, S., Bata Ilyas, J., & Fachmi, M. (2021). Peningkatan Minat Beli Masyarakat Pada Minimarket yang dipengaruhi oleh Promosi dan Keberagaman Produk. Journal of Applied Management and Business Research (JAMBiR), 1(3), 220–229. http://al-idarahpub.com/index.php/jambir/article/view/28

Wisudaningsi, B. A., Arofah, I., & Belang, K. A. (2019). Pengaruh Kualitas Pelayanan Dan Kualitas Produk Terhadap Kepuasan Konsumen Dengan Menggunakan Metode Analisis Regresi Linear Berganda. Statmat : Jurnal Statistika Dan Matematika, 1(1), 103–117. https://doi.org/10.32493/sm.v1i1.2377

Zahari, Suryadi, E., & Hariyanto, D. (2019). Pengaruh Dividen Payout Ratio, Free Cash Flow, Earning Per Share Dan Price Earning Ratio Terhadap Harga Saham Pada Indeks Kompas 100 Yang Terdaftar Di Bursa Efek Indonesia. Jurnal Produktivitas, 6(1), 60–67. http://openjurnal.unmuhpnk.ac.id/index.php/jp/article/view/1488/1126

Published

2024-09-21

How to Cite

Azhari, M. K. H., & Amar, T. I. K. (2024). Analysis of Factors Affecting Labor Productivity in Fixing and Formwork Work on the Joglo Fly Over Rail Project. ASTONJADRO, 13(3), 821–829. https://doi.org/10.32832/astonjadro.v13i3.15783

Issue

Section

Articles