foundation; bridge; bored pile; foundation carrying capacity.Abstract
This research aims to (1) determine the condition of the existing foundation of Ngadi Bridge, (2) design an effective and efficient bored pile for Ngadi Bridge, (3) analyze the ration of the concrete’s volume required for the existing foundation to the redesigned foundation (bored pile) of Ngadi Bridge. This research is the level 1 of Sugiyono’s Research and Development with a mixed method approach. There are two findings established in this research. First, the implementation of existing foundation on Ngadi Bridge caused vibration and noise, and too many foundations in each abutment and pillar caused the need of concrete volume to be increased until 216,14 m3. Second, the bored pile design on Ngadi Bridge for Abutment 1 uses 12 bored piles with diameter of 0,6 m and depth of 15 m. The resulting group carrying capacity is 24501,99 kN. For Abutment 2 uses 6 bored piles with diameter of 0,6 m, depth of 10 m, and the resulting group carrying capacity is 9068,82 kN. While Pillar uses 35 bored piles with diameter of 0,6 m, depth of 4 m, and the resulting group carrying capacity is 22430,43 kN. Third, the total concrete volume of bored pile needs 107,4425 m3. So that the percentage of saving the required volume of concrete is 50,29%.
References
Adam, A. (2006). Delphi Method.
Angraeni, R. (2014). Redesign of JPTK FKIP UNS Building Using SAP 2000 Program Analysis as Implementation of Earthquake Engineering Course (Coarse Aggregate Using 60% Percentage Slag). Thesis.
Anonymous. (2019, April 25). Parts of the Bridge. Retrieved from Karet Malang: https://karetmalang.wordpress.com/
Arikunto. (2018). Research Procedures (Revision VI). Rineka Cipta.
Arsyad, N., Yanti, R. N., & Akbar, H. (2021). Analysis of the Support Capacity of Bored Pile Foundation at the Bukittinggi City Satpol PP Office Building. Rivet, 73-79.
Asiyanto. (2007). Construction Method for Foundation Work. Jakarta: University of Indonesia Publisher (UI-Press).
Assa, V. A., & Mantiri, H. G. (2020). Support Capacity of Shallow Foundation with Sondir Data in Kairagi Dua Village - Manado. Applied Civil Engineering, 47-61.
Awandari, L. P., & Indrajaya, I.G. (2016). The Effect of Infrastructure, Investment, and Economic Growth on Community Welfare through Employment Opportunities.E-Journal EP Unud, 1435-1462.
Aznita, D., Tifani, E., & Lizar. (2018).Redesign of Kengkam Bridge Foundation on Abutment I (Case Study:Kengkam Bridge, Merbau District, Meranti Islands Regency).National Seminar on Industry and Technology (SNIT), 335-344.
Balamba, S., Sompie, O. B., & Sarajar, A. N. (2013).Bridge Foundation Stability Analysis:Case Study of Essang-Lalue Bridge.Journal of Civil Statics, 730-744.
Berawi, M. A. (2015).Innovation Engineering of Mega Infrastructure Projects:Case Study of Sunda Strait Bridge. Jakarta:University of Indonesia Publisher (UI-Press).
Darasena, L., & Dewantoro, F. (2020).Calculation of Bored Pile Volume without Reinforcement in the Construction of Sultan Agung Flyover.Joints, 61-66.
Engineering, C. A. (2021).Final Report on the Construction Planning of Ngadi Bridge, Kediri Regency.
Erfinanto, E. (2022, May 30).Ngadi Bridge Connecting Kediri-Tulungagung to be Built Soon. Retrieved from Liputan 6: https://surabaya.liputan6.com/read/4973760/jembatan-ngadi-penghubung-kediri-tulungagung-segera-dibangun
Fadhilah, U. N., & Tunafiah, H. (2018). Analysis of Bored Pile Foundation Supportability Based on N-SPT Data According to Reese&Wright Formula and Decline.IKRA-ITH Technology, 7-13.
Fahmawati, D. L., & Isnaniati, M. (2016). Effectiveness of the Theory of Soil Support Calculation with NSPT Method (Case Study of At-Tauhid Building Construction of Univ. Muhammadiyah Surabaya).Thesis.
Firdaus, G. R. (2019).Analysis of the Soil Support Capacity of Pile Foundations Using the Vesic Method and Computer Program in the Construction Project of the Flood Control Pump House of the Bendung River Subwatershed.Thesis.
Hasib, S. A. (2020).Analysis of Retaining Wall with and Without Drilled Piles (Case Study: Bojongsoang Cosmetic Factory Project, Bandung).Thesis.
Himawan. (2018).Value Engineering Analysis on Bridge Foundations (Case Study:Kali Cenger Bridge Construction Project of Semarang-Solo Toll Road Salatiga-Boyolali Section Ampel-Boyolali Section).
Joni, I.G. (2017). Factors Causing Failure of Bridge Structures.Paper.
Lapis, J. O., Balamba, S., Sompie, O. B., & Sarajar, A. N. (2013). Bridge Foundation Stability Analysis Case Study:Essang-Lalue Bridge. Journal of Civil Statics, 730-744.
Lestari, I.A., & HS, M. S. (n.d.). Application of Value Engineering for Cost Efficiency in Construction Projects: Case Study of the Construction of Multi-storey Parking Lot of Unair Campus B Surabaya.
Lubis, A. F. (2019). Analytical and Numerical Analysis of Pile Foundation Support Capacity at Medan-Binjai Toll Road Project Section IA Sei Deli Bridge STA 1+600. Thesis.
Mashudi, D. (2017, February 27).BREAKING NEWS - Ngadi Bridge on Kediri-Tulungagung Border Broken by Flood.Retrieved from Surya Malang: https://suryamalang.tribunnews.com/2017/02/27/breaking-news-jembatan-ngadi-di-perbatasan-kediri-tulungagung-putus-akibat-diterjang-banjir
Masiku, H. (2019).Sub Structure Planning of Orongan River Bridge in North Toraja Regency.Dynamic Saint, 756-763.
Muluk, M., Hamid, D., Satwarnirat, Dalrino, & Santi, M. (2020).Comparative Study of Pile Foundations with Bore Pile Foundations (Case Study:Implementation of Grand Kamala Lagoon-Bekasi Tower Foundation Construction). Civil Engineering, Padang Institute of Technology, 26-33.
Nugroho, A. (2021, June 8).Needs Maintenance!Ngadi Bailey Bridge is heavily used by heavy vehicles. Kediri, East Java, Indonesia.
Polit, D. F., & Beck, C. T. (2004).Nursing Research:Principles and Methods. New York:Lippincott Williams & Wilkins.
Purwanto, H. (2022).Comparative Analysis of Bored Pile Foundation Supportability with Pile Driving Analyzer Results (Case Study of Araskabu-Siantari Bridge Project). Thesis.
Rohmawati, R. F., Putra, P. P., & Nurthahjaningtyas, I.(2022).
Redesign Analysis of Abutment Foundation and Retaining Wall of Kendalbulur Village River Bridge, Boyolangu District, Tulungagung Regency. Journal of Civil Engineering, 117-124.
Roschedy, G., Manoppo, F. J., & Mandagi, A. T. (2019). Foundation Supportability Analysis of Gorr I Bridge. Journal of Civil Statics, 397-408.
Rusyid, I., & Indianto, A. (2019). Redesign of Bridge Under Structure with Pile Cap Type Bridge Head.National Seminar on Civil Engineering of Politeknik Negeri Jakarta, 575-580. SNI 1726:2019.(n.d.).
Struyk, H. J., & Veen, K. H. (1990). Bridges.Jakarta:Pradnya Paramita.
Suandri, A. (2020). Supportability of Trestle Pier Piles Using SPT Data in the Kabil Bulk Port Development Project.UIB Repository.
Sugiyono.(2017). Quantitative, Qualitative, and R&D Research Methods.Bandung:Alfabeta.
Sugiyono.(2019). Research and Development (R&D) Methods.Bandung:Alfabeta.
Suhana, A., Rachmat, A., & Kadir, Y. (2020). Implementation of Value Engineering and its Impact on Project Cost Effectiveness and Efficiency. Techno-Socio Ekonomika Journal, 15-30.
Susanto, A., Renaningsih, & Candrarini, R. A. (2020).
Planning of Abutment Drill Pile Foundation of Kali Kendeng Bridge (Comparison of Meyerhof Method and Reese & Wright Method). dynamics of civil engineering, 30-36.
Takwa, R. J. (2017). Modification of Ngancar Bridge Structure Design in Ngawi Regency with Prestressed Concrete Girder System.Applied Final Project.
Widyastuti, F., & Hidayat, N. (2015).Comparative Analysis of Spun Pile and Bore Pile Foundations with the Same Quality in Terms of Work Method, Duration, and Cost on Sumber Waru Bridge of Surabaya-Mojokerto Toll Road Project Section IV.
Winoto, A. D. (2014).Planning Building Foundations. Yogyakarta:TAKA Publisher.
Wiratmoko, B. A., Winarto, S., & SP, Y. C. (2019). Pile Foundation Planning of Nganjuk Food Security Building. Jurmateks, 106-120.
Yulistyawan, A. D. (2022). Evaluation of Foundation Work Methods at Buildings (Case Study of Yogyakarta Islamic University Hospital Building). Final Project.
Yusuf, D. M. (2021). Redesign of the Al-Fath Mosque Building, FKIP Campus 5 UNS with an Accessibility Approach for Persons with Disabilities in Surakarta. Thesis.
Za'irurrahman, M. (2023). Analysis of Bored Pile Foundation Supportability with Analytical and Numerical Methods (Case Study: Construction Project of Basic Lipi Infrastructure Building Bandung - West Java). Thesis.
Bagio, T. H., Baggio, E. Y., Mudjanarko, S. W., & Naibaho, P. R. T. (2021). REINFORCED CONCRETE BEAM AND COLUMN PROGRAMMING BASED ON SNI:2847-2019 ON SMARTPHONE USING TEXAS INSTRUMENTS. ASTONJADRO, 10(2), 287–300. https://doi.org/10.32832/astonjadro.v10i2.5101
Artiwi, N. P., & Rosdiyani, T. (2021). IMPLEMENTATION OF FREE LEARNING POLICY-INDEPENDENT CAMPUS PROGRAMS ON MASTERING COURSE THEORY OF FOUNDATION DESIGN. ASTONJADRO, 10(1), 173–182. https://doi.org/10.32832/astonjadro.v10i1.4419
Rahman, A., Fatnanta, F., & Satibi, S. (2023). Analysis of the Capability of Pile Assembly Foundations in Soft Soil in Physical Modeling of Variationsiin Laboratory Scale Distances. ASTONJADRO, 12(1), 136–143. https://doi.org/10.32832/astonjadro.v12i1.8139
Sitompul, S. T., & Pariatmono, P. (2022). Reliability of simple space truss structure. ASTONJADRO, 11(3), 600–607. https://doi.org/10.32832/astonjadro.v11i3.7399
Lutfi, M., Berangket, R., & Taqwa, F. M. L. (2022). FINITE ELEMENT METHOD MODELLING OF STEEL SHEET PILE STRUCTURE ON DEEP FOUNDATION EXCAVATION. ASTONJADRO, 11(2), 371–381. https://doi.org/10.32832/astonjadro.v11i2.6302
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 ASTONJADRO
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO