Analysis of the Influence of Design, Labor, Materials, and Equipment on Control Models, Time Performance, and Costs of Underground Foundation Works in Bridge Construction
DOI:
https://doi.org/10.32832/astonjadro.v14i2.17585Keywords:
design; labor; materials; equipment; control model; cost performance; time performance.Abstract
In the implementation of construction projects, it has been determined and limited by constraints that are mutually influencing and are commonly referred to as the project constraint triangle, namely the scope of work (scope), time, and cost, these three factors will determine the quality of a project. This study aims to analyze the Design, Labor, Materials, and Equipment Against the Time Performance Control Model and Cost of the Lower Foundation Work (Bore Pile) Bridge Project. The relationship between Design, Labor, and Materials is made a regression analysis with SPSS while the Time Performance Control Model and Cost of the Lower Foundation Work will be made in a path diagram model, and analyzed using SEM-PLS with a sample of 104 respondents. The study's results indicate that design, labor, materials, and equipment significantly influence the control model in bridge construction projects. The control model in bridge construction projects significantly impacts on-time performance and cost performance, design variables, labor, materials, and equipment are the key to improving the control model on-time performance and cost performance. The control model has an effect as a mediation of design, equipment, labor, and materials on cost performance and time performance.
References
Choudhry, R. M., Aslam, M. A., Hinze, J. W., & Arain, F. M. (2014). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7), 4014020.
Fazil, M. W., Lee, C. K., & Tamyez, P. F. M. (2022). The moderating effect of project complexity on the relationship between organizational controls and cost estimation performance: A conceptual model. IOP Conference Series: Earth and Environmental Science, 1067(1), 12045.
Gunduz, M., & Tehemar, S. R. (2020). Assessment of delay factors in construction of sport facilities through multi criteria decision making. Production Planning & Control, 31(15), 1291–1302. https://doi.org/10.1080/09537287.2019.1704903
Hair Jr, J. F., Hult, G. T. M., Ringle, C. M., Sarstedt, M., Danks, N. P., & Ray, S. (2021). Partial least squares structural equation modeling (PLS-SEM) using R: A workbook. Springer Nature.
Harsoyo, Y. A., & Panara, N. (2021). Evaluasi Risiko-Risiko Keterlambatan pada Pelaksanaan Proyek Pembangunan Gedung Kampus C Universitas ‘Aisyiyah Yogyakarta. Dinamika Teknik Sipil: Majalah Ilmiah Teknik Sipil, 14(2), 52–57.
Hernandi, Y., & Tamtana, J. S. (2020). Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 299–312.
Isramaulana, A., & Yuliana, C. (2017). Analysis Of Factors Cause Delay Project Construction Bridge In The City Of Banjarmasin.
Lakaoni, K. D., & Waty, M. (2023). Dampak Change Order Proyek Konstruksi Bangunan Gedung Bertingkat Sedang. JMTS: Jurnal Mitra Teknik Sipil, 6(2), 367–382.
Mulyadi, L., Iskandar, T., & Sjarief, R. O. (2019). Analisa Pembengkakan Biaya Pelaksanaan Proyek-Proyek Pembangunan/Pemeliharaan Jalan di Kabupaten Probolinggo. Jurnal Teknik Sipil INFO MANPRO, 6(1), 37–50.
Pahlawati, N., Rozy, N., & Anwar, S. (2019). Analysis Of Cinapel Bridge Project Construction Management On The Cisundawu Toll Road. Journal of Green Science and Technology, 3(3).
Perdana, K. A., & Widjajakusuma, J. (2022). Evaluasi Kinerja Dengan Penerapan Metode Earned Value Analysis Terhadap Waktu Dan Biaya Proyek (Studi Kasus Gedung Showroom Mobil Mewah Di Jakarta). Journal of Syntax Literate, 7(9).
Putri, M. K. (2019). Pengaruh Rantai Pasok Peralatan Terhadap Keberhasilan Proyek Konstruksi Bangunan Gedung Di Wilayah Surakarta Menggunakan Regresi Linear Berganda.
Rehman, M. A., & Ishak, M. S. Bin. (2022). Role of governmental regulatory controlling procedures between political hazards and risk management. European Project Management Journal, 12(2), 34–49.
Susanto. (2009). Evaluasi Kinerja Waktu dan Biaya Pada Proyek Bangunan Bertingkat Dengan Pendekatan Metode Earned Value Studi kasus Proyek ABC di PT X. UI Press.
Terry, G. R., & Rue., L. W. (2020). Dasar-dasar Manajemen, Terjemahan R Supomo dan Eti (Edisi Revi). Bumi Aksara.
Vigneshwar, R. V. K., & Shanmugapriya, S. (2023). Investigating the factors affecting construction site productivity–a case of India. Engineering, Construction and Architectural Management, 30(2), 963–985.
Wahyuningtyas, A., & Waskito, J. P. H. (2021). Analisa faktor faktor penyebab keterlambatan proyek pembangunan jembatan joyoboyo. Axial: Jurnal Rekayasa Dan Manajemen Konstruksi, 9(2), 71–78.
Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2017). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Konstruksia, 6(1). https://doi.org/10.24853/jk.6.1.%25p
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO