Analysis of Factors Affecting the Quality Achievement of Road Preservation Work on the Long Segment Scheme of National Roads in West Sumatra
DOI:
https://doi.org/10.32832/astonjadro.v14i3.18021Keywords:
road preservation; long segment; road quality; Delphi Method.Abstract
The long segment road preservation scheme represents the government's effort to achieve strategic objectives for well-maintained roads and standards across the segments. Initially, all national road maintenance programs were implemented through self-management by individual road segment managers or Project Implementation Units (PPK), utilizing a conventional contract system executed periodically and focusing solely on the primary works for the effective road length. Routine maintenance of functional lengths was conducted by service users through self-management. Currently, the long segment road preservation scheme is set to replace conventional/self-management contracts, with the expectation of addressing longstanding issues. However, in practice, the implementation of the long segment road preservation projects still encounters challenges, as evidenced by instances of project delays resulting in penalties, substandard construction quality, and overdue project completion. Therefore, this research aims to identify the variables influencing the quality achievement of the long segment road preservation scheme and to ascertain which factors have the most significant impact. Utilizing the Delphi method, we gathered experts with relevant expertise in national road preservation under the long segment scheme in West Sumatra and collected their opinions. Based on the results of our survey, the factors deemed most significant by the experts affecting the quality achievement of the long segment road preservation are material factors, followed by equipment factors, quality testing standards, labor factors, and finally, work method factors. Consequently, several aspects warrant attention in future long segment road preservation projects to ensure quality achievement, including: (1) Utilizing materials that meet quality requirements, (2) Ensuring the suitability of the heavy equipment used, (3) Conducting regular calibrations of the Asphalt Mixing Plant (AMP) and other quality testing equipment, (4) Enhancing labor skills through various training programs, and (5) Adjusting work methods to align with other quality standards.
References
Nofvandro, R.F. dan Mulyono, A.T., (2014), Risiko Keterlambatan Progres Fisik Terhadap Mutu Pelaksanaan Jalan Nasional Di Provinsi Sulawesi Utara, Jurnal Transportasi Vol. 14 No. 1.
Ferdian, T., Isya, M., Ranic, H.A., (2018), “Analisis Hubungan Dan Pengaruh Faktor-Faktor Berkontribusi Terhadap Kinerja Mutu Proyek Konstruksi Jalan Di Provinsi Aceh”, Jurnal Arsip Rekayasa Sipil dan Perencanaa 1(4):174-183.
Mangitung, Donny M, (2006), Identifikasi Dimensi Baru Kriteria Evaluasi Kompetensi Kontraktor Di Kabupaten Banggai Dengan Metoda Analisis Faktor, Jurnal Smartek.
Ramang, R., Frans, J.H., Djahamouw, P.D.K., (2017), “Faktor-Faktor Keterlambatan Proyek Jalan Raya Di Kota Kupang Berdasarkan Persepsi Stakeholder”, Jurnal Teknik Sipil, Vol. VI, No. 1.
Khaqiqi, M.F.A., dan Wulandari, D.A.R., (2019), Tingkat Pemahaman Pelaksanaan Pekerjaan Kontruksi Preservasi Jalan Berbasis Kontrak Long Segment Pada Balai Besar Pelaksanaan Jalan Nasional Viii Surabaya, Narotama Jurnal Teknik Sipil, Volume 3 Nomor 2.
Kiranasari, R.W., Aryani, R.A., Suprayitno, H., Budianto, H., (2020), Penentuan Faktor bagi Analisis Faktor Keberhasilan Proyek Preservasi Jalan Skema Long Segment, Jurnal Manajemen Aset Infrastruktur & Fasilitas – Vol. 4, No. 2.
Budilukito Andri, Agus Taufik Mulyono, (2016), “Kesiapan Kontraktor Terhadap Kebijakan Preservasi Jalan Nasional Di Sumatera Selatan”, Jurnal HPJI Vol. 2 No. 2.
Direktorat Jenderal Bina Marga, (2015), Pelaksanaan Proses Pengadaan Dan Pekerjaan Preservasi Jalan Secara Long Segment, Surat Edaran Nomor: 09/SE/Db/2015
Direktorat Jenderal Bina Marga, (2017), Prosedur Rescoping Pada Kontrak Preservasi Jalan Dengan Skema Long Segment, Surat Edaran Nomor: 09/SE/Db/2015
Kementerian Pekerjaan Umum, (2011), “Permen PU No 13 tahun 2011 tentang Tata Cara Pemeliharaan dan Penilikan Jalan”, Jakarta.
Kementerian Pekerjaan Umum, (2011), “Permen PU No 19 tahun 2011 tentang Persyaratan Teknis Jalan Dan Kriteria Perencanaan Teknis Jalan”, Jakarta.
Lukman Muhamad Al Hakim, (2015), “Studi Evalusi Pelaksanaan Kebijakan Pemeliharaan Jalan Kota Di Kota Surabaya”, Jurnal Kebijakan dan Manajemen Pulik Vol. 3 No. 1.
Sukwadi, R., (2013), Pengembangan Model Integrasi Delphi-Ahp- Markov Dalam Perencanaan Kebutuhan Sumber Daya Manusia, Spektrum Industri, 2013, Vol. 11, No. 2, 117 – 242
Sujatsi, (2014), “Analisa risiko performance based contract pada pemeliharaanjalan nasional”, Prosiding seminar nasional manajemen teknologi XX, Surabaya.
Sukwadi Ronald, (2013), “Pengembangan Model Integrasi Delphi-AHP-Markov Dalam Perencanaan Kebutuhan Sumber Daya Manusia”, Spektrum Industri Vol.11, No.2 (2013).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO