Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects
DOI:
https://doi.org/10.32832/astonjadro.v14i2.18377Keywords:
cost overrun; material costs; anticipation; solution; toll road.Abstract
This paper presents the results of research on anticipation and solutions for material cost overrun in the open system Toll Road project in Jadebotabek. The purpose of this study is to determine the anticipation and solutions for handling material cost overrun. This study was conducted by surveying 76 correspondents consisting of Managers, Consultants and Contractors involved in the construction of Toll roads in Jadebotabek. The survey results were tested for validity and reliability to determine the dominant factors causing cost overrun, then the development of anticipation and solutions for handling material cost overrun was carried out by a team of experts. The results of the study showed that there were 10 valid factors causing cost overrun with a coefficient value of 0.389 - 0.716 and 13 reliable factors causing cost overrun with a Cronbach's alpha value above 0.700. The results of this study also show that anticipation and solutions for handling material cost overrun in toll road projects are preventive measures to reduce and eliminate the occurrence of cost overrun at the planning stage and at the implementation stage.
References
Soeharto, I. (1995). Manajemen Proyek dari Konseptual sampai Operasional. Jakarta, Erlangga.
Kerridge, AF (1987). Mengelola Material Secara Efektif Pengolahan Hidrokarbon.
Bell, LC and G. Stukhart (1986). “Atribut Sistem Manajemen Material.”ASCE - Jurnal Teknik dan Manajemen KonstruksiNomor 112 (1): 14 – 21
Kini. U, D. (1999). “Manajemen Material: Kunci Sukses Manajemen Proyek, ASCE - Jurnal Manajemen Teknik (Januari/Februari): 30. Ahuja, HN (1976). Pengendalian Kinerja Konstruksi melalui Jaringan New York, John Wiley dan Sons: 528.
Stonebraker, EA (1994). Strategi Operasional Massaachusetts, Allyn and Bacon.
Ahuja, HN (1980). Pengendalian Biaya Konstruksi yang Berhasil New York, John Wiley dan Sons.
Halpin, D. dan W. (1998). Manajemen Konstruksi Amerika Serikat, John Wiley and Sons, Inc.:251 - 283.
Zhan, JG (1998). “Model Pengendalian Biaya Proyek.” Jurnal AACE Teknik Biaya 40 (12): 32
Veronika, Alin, TesisRekomendasi Tindakan Koreksi pada Manajemen Material dalam Pengendalian Biaya Proyek Dengan Menggunakan Sistem Pakar, tahun 2002
PPm (1998). Diktat Kursus Lembaga Pendidikan dan Pembinaan Manajemen. Jakarta.
Stukhart, G. (1995). Manajemen Bahan Konstruksi. New York, Marcel Dekker, Inc.
Kerzner, H. (1995). Manajemen Proyek, Pendekatan Sistem untuk Perencanaan, Penjadwalan, dan Pengendalian. New York, Van Nostrand Reinhold.
Johnston, EJ (1987). Kontrol Material di Lokasi. London, Butterworth.
Hamzah, A. (1994). “Perspektif Praktik Manajemen Material dalam Ekonomi yang Berkembang Pesat. Manajemen dan Ekonomi Konstruksi.
Ahuja, HN (1976). Pengendalian Kinerja Konstruksi melalui Jaringan New York, John Wiley dan Sons:
Russell, AD dan A. Fayek (1994). “Asisten Pemilihan Tindakan Korektif Otomatis.” ASCE-Jurnal Teknik dan Manajemen Konstruksi120 (No. 1 Maret)
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO