Risk Analysis of Steel Railway Bridges Based on Rating Factor, Earthquake, and Importance Factor
DOI:
https://doi.org/10.32832/astonjadro.v14i4.19038Keywords:
railway bridge, rating factor, hazard, importance factor, risk.Abstract
Railway bridges are critical infrastructure components that are essential to support and maintain the integrity of major rail transportation networks. Indonesia is located in a tectonic zone known as the Ring of Fire. Risk assessment of these bridges is critical. This research not only considers the physical condition or vulnerability of the bridge itself but also the risk posed by earthquakes and the level of importance of the bridge. The research was conducted on 4 bridges located in East Java Province, namely the BH-129, BH-262, BH-275, and BH-314 Bridges. The rating factor, hazard level, and importance factor influence the risk level. The assessment process starts by using the Bridge Management System (BMS) method and Structure Analysis Program (SAP2000) to assist in calculating the Rating factor. Determining the level of danger by referring to the Earthquake Hazards Map and the Indonesian Earthquake Code (SNI 2833: 2016), The importance is taken based on the level of operational importance of the bridge referring to the same standard. The results show that the four bridges have the same risk value of 0.7809 for each bridge. The results underscore the urgent need for proactive measures to reduce the potential adverse impacts of bridge structure failure. Recommended interventions include strengthening structural elements, increasing inspection frequency, improving maintenance protocols, and, if necessary, replacing compromised structures. These strategies are critical due to the high risk and significant impact on rail safety and operations, especially in areas prone to natural disasters. The results of this study reinforce the urgency of improving the resilience of bridge infrastructure to earthquake threats to maintain the stability and safety of rail transportation in Indonesia.
References
Suwandi. (2021). Pengenalan Jembatan (W. T. Adi, Ed.; Edisi Revisi). Deepublish.
Mardhiyah, A., Tarigan, J., & Sitanggang, E. S. Y. (2022). Studi Literatur: Pengaruh Gempa Terhadap Jembatan. RADIAL, 10(1), 46–59.
Arvin, M., Beiki, P., Hejazi, S. J., Sharifi, A., & Atashafrooz, N. (2023). Assessment of infrastructure resilience in multi-hazard regions: A case study of Khuzestan Province. International Journal of Disaster Risk Reduction, 88. https://doi.org/10.1016/j.ijdrr.2023.103601
Pusat Penelitian dan Pengembangan Perumahan dan Permukiman, Badan Penelitian dan Pengembangan, & Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2017). Peta Sumber dan Bahaya Gempa Indonesia.
Sugeng, & Rosadi, H. (2011). Interpretasi Citra SRTM dan Analisis Seismotektonik untuk Mengetahui Penyebab Rel Kereta Api Patah di Resort 6.6 Prambanan akibat Pengaruh Gempa 27 Mei 2006. Proseding Seminar Nasional Kebumian 2011.
Moret, W. (2014). Vulnerability Assessment Methodologies: A Review of the Literature.
Joshi, D., Takeuchi, W., Kumar, N., & Avtar, R. (2024). Multi-hazard risk assessment of rail infrastructure in India under local vulnerabilities towards adaptive pathways for disaster resilient infrastructure planning. Progress in Disaster Science, 21. https://doi.org/10.1016/j.pdisas.2023.100308
Hao, M., & Nie, Y. (2022). Hazard identification, risk assessment and management of industrial system: Process safety in mining industry. Safety Science, 154. https://doi.org/10.1016/j.ssci.2022.105863
Aflatooni, M., Chan, T., David, T., & Thilakarathna, I. (2012). Classification of Railway Bridges Based on Criticality and Vulnerability Factors. In R. R (Ed.), Proceedings of the 2012 Australasian Structural Engineering Conference. (pp. 1–8). Engineers Australia.
Zaeni, M. R., Ambari, S. F., Sudarsono, I., & Mulyawati, F. (2022). Analisis Nilai Kapasitas Jembatan Eksisting Menggunakan Metode Rating Factor. https://doi.org/10.26760/rekaracana
Andrić, J. M., & Lu, D. G. (2016). Risk assessment of bridges under multiple hazards in operation period. Safety Science, 83, 80–92. https://doi.org/10.1016/j.ssci.2015.11.001
Koks, E. E., Rozenberg, J., Zorn, C., Tariverdi, M., Vousdoukas, M., Fraser, S. A., Hall, J. W., & Hallegatte, S. (2019). A global multi-hazard risk analysis of road and railway infrastructure assets. Nature Communications, 10(1). https://doi.org/10.1038/s41467-019-10442-3
Kementrian Pekerjaan Umum dan Perumahan Rakyat Direktorat Jendral Bina Marga. (2022). Pedoman Bidang Jalan dan Jembatan - Pemeriksaan Jembatan.
Pusat Studi Transportasi dan Logistik. (2024). Laporan Risiko pada Bangunan Jembatan dan Terowongan Jalur Kereta Api.
Kementrian Pekerjaan Umum dan Perumahan Rakyat. (2016). Pedoman Penentuan Bridge Load Rating untuk Jembatan Eksisting.
Badan Standardisasi Nasional. (2016). Standar Nasional Indonesia Perencanaan jembatan terhadap beban gempa (SNI 2833:2016). www.bsn.go.id
Dalezios, & Nicolas R. (2017). Environmental Hazards Methodologies for Risk Assessment and Management (Vol. 16). Water Intelligence Online. https://doi.org/10.2166/9781780407135
International Organization for Standardization. (2018). ISO 45001 Occupational health and safety management systems 一 Requirements with guidance for use. www.iso.org.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO