Influencing Factor of Bore Pile Delay's Work at Green Campus to Improve Time Performance
DOI:
https://doi.org/10.32832/astonjadro.v14i4.19237Keywords:
relative importance index, critical path method, bore pile, green campus.Abstract
The construction of the Green Campus of Sentul Defense University has suffered a setback from the planned schedule. In its planning, this project will be carried out for 5 months from May 2024 to September 2024, but it was delayed due to foundation work. The bore pile foundation work itself was carried out for 70 days from the 5th week to the 14th week. The bore pile work was planned to start in the 5th week, but in its implementation, it was only done in the 10th week, so it is necessary to identify the factors causing the delay and assess the level of importance. Therefore, this study aims to rank the factors that cause delays in bore pile work using the Relative Importance Index (RII). The variables consist of Owner (X1), Consultant (X2), Contractor (X3), Environment and K3 (X4), Materials and Equipment (X5), Construction Management (X6). The research method used is quantitative survey with descriptive analysis. The results of the analysis and calculation of the RII are the dominant factor causing the delay in bore pile work based on the variable is Owner (X1). Meanwhile, the dominant factor causing delays in bore pile work based on indicators is the Owner's delay in the approval process and making design changes (X1.2). The results of this study are expected to be a reference in the next bore pile work in the green campus project.
References
F. Simorangkir, M. A. K. Harahap, dan D. Damanik, “Analisis Penerapan Manajemen Waktu Proyek KonstruksiPerumahan Subsidi Type 36 Di Sigambogambo Lobu Siregar II Kecamatan Siborong – Borong,” J. Santeksipil, vol. 2, no. 2, Okt 2021, doi: 10.36985/jsl. v2i2.546.
R. R. Nabil, X. Furuhitho, L. Setiawan, R. H. Susanto, dan P. J. Slameto, “Perencanaan Pengendalian Biaya dan Waktu pada Proyek Pembangunan Rumah Susun Stie Tazkia Cendikia Bogor dengan Metode Earned Value,” J. Soc. Sci. Res., vol. 3, no. 6, hlm. 7591–7600, 2023.
S. Perdana dan A. Rahman, “Penerapan Manajemen Proyek dengan Metode CPM (Critical Path Method) Pada Proyek Pembangunan SPBE,” Amaliah J. Pengabdi. Kpd. Masy., vol. 3, no. 1, hlm. 242–250, Feb 2019, doi: 10.32696/ajpkm. v3i1.235.
T. Lartey, D. O. Yirenkyi, S. Adomako, A. Danso, J. Amankwah‐Amoah, dan A. Alam, “Going green, going clean: Lean‐green sustainability strategy and firm growth,” Bus. Strategy Environ., vol. 29, no. 1, hlm. 118–139, Jan 2020, doi: 10.1002/bse.2353.
N. Ito, “Kampus universitas yang cerdas dan hijau,” J. Int. Komun. Energi Dan Lingkung. Maejo, 2019.
W. Mohdar, R. Serang, dan H. D. Titaley, “Analisa Faktor Penyebab Keterlambatan Pekerjaan Bore Pile Pada Proyek Pembangunan Sekolah Citra Kasih Ambon Dengan Metode Fault Tree Analysis (FTA),” Parameter J. Mat. Stat. Dan Ter., vol. 3, no. 01, hlm. 19–32, Feb 2024, doi: 10.30598/parameterv3i01pp19-32.
P. D. Saputra dan A. Hidayat, “Analisis Pengukuran Relative Importance Index (Rii) untuk Menentukan Peringkat Faktor Penyebab Keterlambatan Pekerjaan Kanopi Proyek East Connection Taxiway Bandara Soekarno-Hatta,” Constr. Mater. J., vol. 5, no. 3, hlm. 235–250, Nov 2023, doi: 10.32722/cmj. v5i3.6311.
A. F. A. Z. Mughni, H. T. Tjendani, dan B. Witjaksana, “Analisis Kinerja Biaya Menggunakan Metode Earned Value pada Pelestarian Jalan Keluar Tol 5 Pandaan Malang,” Int. J. Adv. Technol. Eng. Inf. Syst. IJATEIS, vol. 2, no. 4, hlm. 294–311, Jan 2024, doi: 10.55047/ijateis. v2i4.969.
I. K. A. Ariana dan D. A. Lestari, “Analisis Kinerja Proyek Optimalisasi SPAM Gatak Kabupaten Sukoharjo dengan Metode Earned Value,” J. Integr. Syst., vol. 6, no. 1, hlm. 87–102, Jul 2023, doi: 10.28932/jis. v6i1.6521.
A. E. Husin dan F. Sustiawan, “Analisa RII (Relative Important Index) Terhadap Faktor-Faktor yang Berpengaruh dalam Mengimplementasikan BIM 4D dan M-PERT pada Pekerjaan Struktur Bangunan Hunian Bertingkat Tinggi,” J. Apl. Tek. Sipil, vol. 19, no. 4, hlm. 417, Des 2021, doi: 10.12962/j2579-891X.v19i4.9336.
A. Purwantoro, K. J. Suhin, dan W. Nuswantoro, “Pengendalian Proyek Konstruksi Gedung Menggunakan Critical Path Method (CPM) dan Earned Value Method (EVM),” J. Tek. J. Teor. Dan Terap. Bid. Keteknikan, vol. 5, no. 2, 2022.
A. Eddy Husin, N. Sari, B. Detty Kussumardianadewi, T. Ilyas, dan T. Saleh, “Analysis of the Implementation of Bim Based Quantity Take Off on HighLevel Building Structure Working with Relative Important Index,” Int. J. Adv. Sci. Technol., vol. 29, no. 4, hlm. 3346–3353, 2020.
Y. Utami, “Uji Validitas dan Uji Reliabilitas Instrument Penilaian Kinerja Dosen,” J. Sains Dan Teknol., vol. 4, no. 2, hlm. 21–24, Feb 2023, doi: 10.55338/saintek. v4i2.730.
L. Alfaris, M.T. dkk., “RISET OPERASI,” dalam Riset Operasi, Cetakan Pertama., vol. 1, Bandung: INDIE PRESS, 2022, hlm. Bab 10.1-10.5 hal. 95-99. [Daring]. Tersedia pada: www.indiepress.co.id
A. F. Enisah dan F. Hardiyanti, “Analisis Jalur Kritis Pada Pekerjaan Konstruksi Pondasi Menggunakan Metode Critical Path Method (CPM),” J. Tek. Sipil PPNS, 2023.
J. Thoengsal dan M. Tumpu, Metode Optimalisasi Penjadwalan Pelaksanaan Proyek Konstruksi Menggunakan Metode Critical Path Method (CPM), Cetakan Pertama., vol. 1. Makassar: CV. Tohar Media, 2022. [Daring]. Tersedia pada: https://toharmedia.co.id
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO