Performance Evaluation of Construction Waste Management through a Sustainable Development Approach (Case Study: Green Plesungan Housing Project Development)

Authors

  • Muhammad Ma'mun Harits Abdullah INDONESIA
  • Mochamad Solikin INDONESIA
  • Dhani Mutiari INDONESIA
  • Senja Rum Harnaeni INDONESIA

DOI:

https://doi.org/10.32832/astonjadro.v15i1.20751

Keywords:

construction management, construction waste, sustainable development, waste management and waste material.

Abstract

The continuous growth of infrastructure development in Indonesia has led to a significant increase in construction waste, impacting project costs and environmental sustainability. This study aims to evaluate the performance of construction waste management using a sustainable development approach in the Green Plesungan Housing Project. The research employed a quantitative approach through site observations, technical data collection, and questionnaire distribution to 30 construction stakeholders. The evaluation began with the calculation of waste materials, waste levels, and waste costs, followed by statistical analyses including instrument testing, classical assumption testing, multiple linear regression, simultaneous and partial tests, the coefficient of determination test, as well as the formulation of recommended steps to minimize waste. The study identified 16 types of construction waste, with structural works being the largest contributors. The total waste cost reached 3.48% of the material contract value of Rp. 33,617,860.77, with lightweight bricks contributing the highest cost at 1.06%, amounting to Rp. 10,275,739.37. Statistical results indicated that six out of seven variables significantly influenced the implementation of sustainable practices, with a contribution of 95.4%. Site supervision, on-site execution, and environmental conditions were identified as the dominant factors contributing to waste production. The proposed strategies to minimize waste include enhancing planning accuracy, improving logistics management, promoting disciplined and efficient execution, and strengthening site supervision. This study provides valuable insights for developing integrated construction waste management strategies that not only reduce waste costs but also support the realization of sustainable and efficient housing development in the future.

Author Biographies

Muhammad Ma'mun Harits Abdullah, INDONESIA

Master of Civil Engineering, Universitas Muhammadiyah Surakarta, Sukoharjo

Mochamad Solikin, INDONESIA

Master of Civil Engineering, Universitas Muhammadiyah Surakarta, Sukoharjo

Dhani Mutiari, INDONESIA

Master of Civil Engineering, Universitas Muhammadiyah Surakarta, Sukoharjo

Senja Rum Harnaeni, INDONESIA

Master of Civil Engineering, Universitas Muhammadiyah Surakarta, Sukoharjo

References

[1] N. S. F. Arofah, “Pengaruh Pembangunan Infrastruktur Dasar terhadap Pertumbuhan Ekonomi di Indonesia,” J. Pendidik. Ekon. Indones., vol. 3, no. 1, pp. 231–239, 2021, doi: https://doi.org/10.17509/jpei.v3i2.31443.

[2] T. O. Pamungkas, M. Rifai, and K. Soeryodarundino, “Penerapan Lean Construction menggunakan Root Cause Analysis dan Metode Borda dalam mengidentifikasi Waste Non-Value Added Activity (Studi Kasus: Proyek Pembangunan Bendungan Jragung Paket I PT Waskita Karya),” Sustain. Civ. Build. Manag. Eng. J., vol. 1, no. 2, pp. 1–14, 2024, doi: https://doi.org/10.47134/scbmej.v1i2.2981.

[3] Tim Kementerian Keuangan RI, “Informasi APBN TA 2024: Mempercepat Transformasi Ekonomi yang Inklusif dan Berkelanjutan,” 2024, Kementerian Keuangan Republik Indonesia. [Online]. Available: https://anggaran.kemenkeu.go.id/api/Medias/454fb34d-dd52-4edf-a6cc-e443f06fe44f

[4] Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia, “Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 23 Tahun 2020 tentang Rencana Strategis Kementerian Pekerjaan Umum dan Perumahan Rakyat Tahun 2020-2024,” 2020, Jakarta.

[5] C. A. Sapulete, H. A. Lie, and Y. A. Priastiwi, “Sustainability Beton Metode Life Cycle Assessment Studi Kasus: Limbah Beton Laboratorium Bahan dan Konstruksi Departemen Teknik Sipil Universitas Diponegoro Semarang,” Media Komun. Tek. Sipil, vol. 24, no. 2, p. 140, 2019, doi: https://doi.org/10.14710/mkts.v24i2.18863.

[6] L. Wulandari, D. D. Umar, D. Septiani, H. H. Iskandar, M. Safina, and V. A. Haq, “Analisis Pengaruh Globalisasi dan Perkembangan Teknologi Nuklir terhadap Lingkungan Hidup Yang Berkelanjutan (Sustainable Environment),” J. Bisnis dan Manaj. West Sci., vol. 1, no. 01, pp. 36–50, 2022.

[7] H. S. Hasibuan and S. S. Tumuyu, Perencanaan Pembangunan Berkelanjutan. Jakarta Pusat: Universitas Indonesia Press, 2023.

[8] R. S. Sanusi, Sulistyoweni, and B. Trigunarsyah, “Permasalahan Pemborosan/Biaya-Tak-Perlu pada Pelaksanaan Konstruksi di Indonesia,” in Peringatan 25 tahun Manajemen & Rekayasa Konstruksi (MRK) di Indonesia, 2005, pp. 1–9. doi: http://dx.doi.org/10.13140/2.1.2719.3609.

[9] E. Febianti, L. Herlina, and A. Herfaisal, “Analisis Proyek Konstruksi menggunakan Critical Chain Project Management dan Lean Construction untuk Meminimasi Waste,” in Aplikasi Teknologi Maju & Ramah Lingkungan Untuk Kemandirian Bangsa, 2015, pp. 1–11.

[10] I. A. R. Widhiawati, N. Y. Astana, and N. L. A. Indrayani, “Kajian Pengelolaan Limbah Konstruksi pada Proyek Pembangunan Gedung di Bali,” J. Ilm. Tek. Sipil, vol. 23, no. 1, pp. 55–61, 2019, doi: https://doi.org/10.24843/JITS.2019.v23.i01.p07.

[11] T. R. P. Angguningtyas and M. Beatrix, “Analisis Waste Material dengan Pendekatan Lean Construction pada Proyek Pembangunan Rumah Dinas,” J. Sci. Res. Dev., vol. 6, no. 1, pp. 505–512, 2024, doi: https://doi.org/10.56670/jsrd.v6i1.360.

[12] E. Handayani and F. Veronata, “Analisis dan Identifikasi Sisa Material Konstruksi pada Pekerjaan Beton (Studi Kasus pada pekerjaan Pembangunan Pasar Rakyat Talang Banjar),” J. Ilm. Univ. Batanghari Jambi, vol. 19, no. 2, pp. 383–386, 2019, doi: http://dx.doi.org/10.33087/jiubj.v19i2.684.

[13] U. H. Umar and D. Karlina, “Analisis Limbah Material Konstruksi pada Pembangunan Sport Hall dengan Metode Lean Construction (Studi Kasus: Sport Hall Universitas Internasional Batam),” J. Civ. Eng. Plan., vol. 1, no. 1, pp. 85–91, 2020, doi: https://doi.org/10.37253/jcep.v1i1.7255.

[14] J. T. Handayani and I. A. A. Angreni, “Analisis Potensi Pemborosan Material dan Solusi Penanganannya pada Proyek Pembangunan Gedung Bertingkat (Studi Kasus : Proyek Gedung Bertingkat di Tangerang Selatan),” J. Tek. Sipil, vol. 27, no. 3, pp. 273–282, 2020, doi: https://doi.org/10.5614/jts.2020.27.3.9.

[15] A. M. Hadut and K. Koesmargono, “Kajian Identifikasi Penyebab Construction Waste pada Kontraktor Di Daerah Yogyakarta dan Kupang,” J. Tek. Sipil, vol. 25, no. 3, pp. 237–246, 2018, doi: https://doi.org/10.5614/jts.2018.25.3.9.

[16] R. I. G. Allo and A. Bhaskara, “Analisis Waste Material dengan Penerapan Lean Construction,” J. Tek. Sipil, vol. 18, no. 2, pp. 343–355, 2022, doi: https://doi.org/10.28932/jts.v18i2.4494.

[17] Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta, 2013.

[18] A. A. G. N. R. Diva, I. I. W. Sudiasa, and I. N. Ramia, “Analisis Waste Material Proyek Berbasis Metode Pareto dan Fault Tree Analysis,” Politeknik Negeri Bali, 2022.

Published

2026-03-03

How to Cite

Abdullah, M. M. H., Solikin, M., Mutiari, D., & Harnaeni, S. R. (2026). Performance Evaluation of Construction Waste Management through a Sustainable Development Approach (Case Study: Green Plesungan Housing Project Development). ASTONJADRO, 15(1), 161–173. https://doi.org/10.32832/astonjadro.v15i1.20751

Issue

Section

Articles