Development of a Predictive Model for Road Maintenance Management Based on Correlation of IRI, PCI and Traffic Data
DOI:
https://doi.org/10.32832/astonjadro.v15i4.23736Keywords:
IRI, PCI, predictive model, earned value management, road maintenance management, makassar-parepare corridor.Abstract
National road infrastructure is a strategic asset requiring effective, data-driven maintenance management systems. This study develops a predictive model for road maintenance management through correlation analysis of International Roughness Index (IRI), Pavement Condition Index (PCI), and traffic parameters on the 155 km Makassar-Parepare corridor. A quantitative descriptive-explanatory approach was applied to 26,818 observation segments spanning 2020-2024 from the BBPJN South Sulawesi Pavement Management System. Multiple regression models were developed with 70:30 validation split, and Earned Value Management (EVM) was implemented on 50 maintenance projects totaling IDR 65.08 billion. Results show a significant negative IRI-PCI correlation (r = -0.2710, p < 0.001) and weak positive IRI-AADT correlation (r = +0.1898, p < 0.001). The regression model yielded R² = 0.1110 for IRI prediction (RMSE = 1.03 m/km) and R² = 0.1053 for PCI (RMSE = 12.55), with pavement age (AGE) as the strongest predictor. Validation shows the Moderate Scenario 2024 prediction (IRI 5.71 m/km) nearly identical to actual data (5.70 m/km). EVM analysis produced mean CPI of 0.9758 and mean SPI of 0.9435. Integration of predictive models, EVM, and IRMS unit costs yields a data-driven maintenance strategy with 15-20% potential budget savings through timely preventive maintenance.
References
[1] Badan Pusat Statistik Sulawesi Selatan. (2020-2024). Jumlah Kendaraan Bermotor per Kabupaten/Kota dan PDRB per Kapita di Sulawesi Selatan. BPS Sulsel, Makassar.
[2] Hamedi, A., Yang, X., Zhang, Z., dan Rajagopalan, A. (2020). Leveraging Long-Term Pavement Performance Database to Investigate Relationship Between IRI and PCI. Transportation Research Record, 2674(7), 498-510.
[3] Radwan, N., Khedr, S., dan Hassan, M. (2024). Correlation Between Pavement Condition Index and International Roughness Index for Urban Roads in Arid Climate. International Journal of Pavement Engineering, 25(1).
[4] Qiao, Y., Dhulipala, S., dan Santos, J. (2025). IRI Prediction Model Integrating PCI, Distress Types, Climatic Data and Traffic Data Based on Dual-Model Approach. Construction and Building Materials, 460, 139773.
[5] Evans, M., Sumarwan, U., dan Hidayat, R.S. (2025). Analisis Kondisi Perkerasan Jalan Ruas Maros-Makassar Menggunakan Metode PCI dan IRI. JILMATEKS, 3(1), 389.
[6] Sari, D., Sukmawati, S., dan Hasanuddin, A. (2023). Perbandingan Nilai Kerusakan Jalan Berdasarkan Metode PCI dan Metode IRI. Jurnal EXTRAPOLASI, 18(2), 67-78.
[7] Aramali, V., Gibson Jr., G.E., Cho, K., dan Walewski, J.L. (2023). Earned Value Management Environment Maturity: Understanding the Role of Top Management Support. Journal of Management in Engineering, 39(4).
[8] Proano-Narvaez, G.A., Ortega-Fierro, S.N., dan Torres-Jara, G.A. (2022). Earned Value Management Implementation on Road Construction Projects in Ecuador. Journal of Construction Engineering and Management, 148(3).
[9] World Bank in the early 1980s.
[10] Llopis-Castello, D., Moreno-Navarro, F., Rubio-Gamez, M.C., dan Montalban-Domingo, L. (2024). Contribution of Connected Vehicles Data to Road Roughness Monitoring: A Systematic Review. Transportation Research Part C, 161, 104578.
[11] Mahlberg, J., Gkritza, K., Sangiorgi, C., Covaciu, D., dan Polenscak, A. (2022). Performance Characterization of Connected Vehicle-Based International Roughness Index. Transportation Research Record, 2676(4).
[12] Direktorat Jenderal Bina Marga. (2024). Data RKAKL Kegiatan Pembangunan Jalan dan Preservasi Jalan TA. 2020-2024. Kementerian PUPR, Jakarta.
[13] U.S. Army Corps of Engineers (1978).
[14] ASTM D6433-23. (2023). Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys. ASTM International, West Conshohocken.
[15] Saefudin, I., Darsana, I.W., dan Sudiasa, I.W. (2024). Analisis Penilaian Kondisi Perkerasan Jalan dengan Metode PCI, SDI dan IRI. Syntax Idea, 6(4), 1870-1883.
[16] Santosa, S., Siegfried, dan Kania, B. (2022). Identifikasi Kebutuhan Penanganan Jalan Berdasarkan Nilai IRI dan PCI. Jurnal Indonesia Sosial Teknologi, 3(11), 1188-1204.
[17] Balai Besar Pelaksanaan Jalan Nasional Sulawesi Selatan. (2020-2024). Data Kondisi Jalan (IRI, PCI, AADT) Koridor Makassar-Parepare. BBPJN Sulsel, Makassar.
[18] Birasungi, C.F., Waani, J.E., dan Manoppo, M.R.E. (2019). Evaluasi Struktur Perkerasan Lentur Menggunakan PCI dan IRI (Studi Kasus: Yos Sudarso Manado). Jurnal Sipil Statik, 7(1), 137-146.
[19] Rachman, W., Idris, M., dan Fauzi, A. (2024). Model Prediktif Kerusakan Jalan Berbasis Tren Pertumbuhan Kendaraan. Teknomatika, 19(1), 33-45.
[20] Ispriyanti, D. dan Kusuma, A. (2024). Analisis Level Kerusakan Jalan Menggabungkan Metode PCI, SDI, IRI dan PKJI 2023. Potensi, 18(1), 23-36.
[21] Wang, L., Zhang, Y., dan Liu, H. (2024). Pavement Performance Prediction using Machine Learning Techniques. Transportation Research Part D: Transport and Environment, 126, 103967.
[22] IRMS (Indonesia Road Management System). (2024). Summary of Treatment Unit Cost – R08 Sulawesi Selatan. Ditjen Bina Marga, Jakarta.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 ASTONJADRO

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Paper submitted to ASTONJADRO is the sole property of the Astonjadro Journal. Unless the author withdraws the paper because he does not want to be published in this journal. The publication rights are in the journal Astonjadro.ASTONJADRO
LICENSE
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at http://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO