[1]
Panjaitan, A.L.P., Hasibuan, G.C.R. and Anas, M.R. 2025. The Analysis of Rescheduling the Savanna Sumatera Bridge Project Using the Pert Method . ASTONJADRO. 14, 2 (May 2025), 442–452. DOI:https://doi.org/10.32832/astonjadro.v14i2.17302.