ISFAHANI, M. N.; ANTONIUS, A.; WIBOWO, K. Anticipation and Solutions for Cost Overruns of Material Costs in Toll Road Construction Projects. ASTONJADRO, [S. l.], v. 14, n. 2, p. 692–698, 2025. DOI: 10.32832/astonjadro.v14i2.18377. Disponível em: https://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO/article/view/18377. Acesso em: 5 dec. 2025.