Astariani, N. K., Pagehgiri, J. and Pratama, N. (2025) “Optimizing Project Implementation Time and Cost Using the Least Cost Method”, ASTONJADRO, 14(3), pp. 940–955. doi: 10.32832/astonjadro.v14i3.18758.