Husin, Albert Eddy, Elysa Damayanti, Muhammad Nur Rohman, and Wyllem Ator. “Cost Performance Improvement in the Green Transit Oriented Development (TOD) Area Based on Blockchain-Building Information Modelling (BIM)”. ASTONJADRO 14, no. 2 (May 13, 2025): 505–514. Accessed December 5, 2025. https://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO/article/view/17392.