Husin, Albert Eddy, and Alwan Danumurti. “Dynamic Modeling of Time Cost Trade Off in Design and Build Projects of High Rise Office Buildings”. ASTONJADRO 12, no. 3 (October 6, 2023): 746–752. Accessed May 9, 2024. https://ejournal.uika-bogor.ac.id/index.php/ASTONJADRO/article/view/9070.