Hariansyah, M., and Charles Miliyon. 2015. “PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 KV PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) BINARY CYCLE DIENG”. JuTEkS (Jurnal Teknik Elektro Dan Sains) 2 (1). https://doi.org/10.32832/juteks.v2i1.346.