Review Of Project Delay Factors On Project Cost Explanation : Lampung Sugar Factory – Mill House

Penulis

  • Jujuk Kusumawati Institut Teknologi Budi Utomo Jakarta
  • Rolan Mediana Silaban Institut Teknologi Budi Utomo Jakarta

DOI:

https://doi.org/10.32832/inova-tif.v5i1.7928

Abstrak

The problem of delays in the construction industry is a national phenomenon and Jakarta is no exception. The main purpose of this study is to identify the factors of project delays and their effects on cost overruns for building projects in Jakarta. ) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) subcontractors. Then an analytical survey was conducted which was distributed to 26 respondents. The ten delay factors were analyzed to determine their effect on project cost overruns. From the results of the analysis it can be seen that: (1) office overhead (2) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) Subcontractors have their respective weights of influence on project cost overruns

Referensi

Austen A.D., dan R.H. Neale, 1994, Manajemen Proyek Konstruksi Pedoman, Pro Ses dan Prosedur, PPM dan PT Pustaka Binaman Pressindo, Jakarta.

Anonim, Undang-Undang Republik Indonesia nomor 18 tahun 1999, tentang Jasa Kontruksi.

Arifal Hidayat, 2004, Faktor-faktor penyebab keterlambara diproyek konstruksi

Assaf et al, 1995, Causes of Delay in Large Building Contruction Project.

Chaliabi dan Camp, 1984, Causes of Delay and Overruns of Contruction Project

Donal S. Barie, 1984, Dealy Coused by Owner on His Agent

Istimawan Dipihusodo, 1996, Manajemen Proyek dan Konstruksi jilid 1 da n 2, KanNisius, Yogyakarta

Imam Soeharto, 1997, Manajemen Proyek dari Konseptual sampai Operasional, Erlangga, Jakarta.

Jervis B.M., Levin P., 1998, Construction Proyect Schedulling, Mc Graw Hill, New York

Diterbitkan

2022-08-27

Cara Mengutip

Kusumawati, J., & Silaban, R. M. (2022). Review Of Project Delay Factors On Project Cost Explanation : Lampung Sugar Factory – Mill House. INOVA-TIF, 5(1), 40–45. https://doi.org/10.32832/inova-tif.v5i1.7928

Terbitan

Bagian

Artikel