Analisis Faktor yang Mempengaruhi Produktivitas Tenaga Kerja dengan Fuzzy AHP pada Proyek Bantalan Beton Divre IV Tanjungkarang

Authors

DOI:

https://doi.org/10.32832/komposit.v9i1.17563

Keywords:

labor productivity factors, fuzzy analytical hierarchy process, concrete bearing replacement

Abstract

Economic growth in a country can be reflected by the number of construction projects. To achieve robust economic growth, effective human resource management is required to enhance productivity. One aspect that affects work productivity is the labor force. This research aims to analyze the factors and tasks that influence labor productivity in Concrete Bearing Replacement Projects. Given the many factors or criteria to consider, the Fuzzy Analytical Hierarchy Process (Fuzzy AHP) method is used for identification. The Fuzzy AHP method assists in evaluating various criteria and determining the relative weights of each factor to make informed decisions. To simplify the analysis, 4 criteria and 12 sub-criteria are used. Based on the analysis, the factor with the greatest impact on labor productivity is the work area (K2-1) with a weight of 0.1327, while the factor with the lowest weight is the accuracy of material delivery to the location (A2) with a weight of 0.0442. The tasks that relatively impact labor productivity include loading and unloading concrete bearings (A3) with a weight of 0.0029, replacing concrete bearings with a weight value of 0.0026, and the lowest impact tasks are dismantling gongsol and revising curves, with a weight value of 0.0022.

References

Bora, P. N. (2021). Analisis Produktivitas Tenaga Kerja Pada Pelaksanaan Proyek Rehabilitasi Jalan Dan Pembangunan Jembatan Siangan-Lokasrana (Doctoral Dissertation, Universitas Mahasaraswati Denpasar). https://eprints.unmas.ac.id/id/eprint/1043

Chang, D. Y. (1996). Applications Of The Extent Analysis Method On Fuzzy AHP. European Journal Of Operational Research, 95(3), 649-655.https://doi.org/10.1016/0377-2217(95)00300-2

Edulan, E. K. (2016). Analisa Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Tukang Batu (Studi Kasus: Hotel Grand Malebu Makasar (Doctoral dissertation, ITN malang). http://eprints.itn.ac.id/id/eprint/2128

Emrouznejad, A., & Ho, W. (2017). Fuzzy Analytic Hierarchy Process. CRC Press. https://doi.org/10.1201/9781315369884

Fajarviani, S. E. L., Usman, K., & Winarsih, A. L. C. (2022). Selection of the Use of Formwork in the Holiday Inn Bukit Randu Hotel Project Using the Fuzzy AHP Method. AVIA, 4(2). DOI: https://doi.org/10.47355/avia.v4i2.74

Faradina, M. P. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pembesian Dan Bekisting MTSN 3 Kota Pekanbaru (Doctoral dissertation, Universitas Islam Riau). http://repository.uir.ac.id/id/eprint/14008

Faustine, C., & Waty, M. (2022). Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi. JMTS: Jurnal Mitra Teknik Sipil, 681-692. https://lintar.untar.ac.id/repository/penelitian/buktipenelitian_10318005_4A270123150206.pdf

Harun, M. (2013). Analisa Produktifitas Tenaga Kerja Pada Pekerjaan Konstruksi Gedung. Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja), 1(2). https://doi.org/10.24929/ft.v1i2.60

Mukhlisiana, M., & Adry, M. R. (2021). Analisis Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja di Indonesia. Jurnal Kajian Ekonomi dan Pembangunan, 3(3), 89. https://doi.org/10.24036/jkep.v3i3.12372

Nasron, N., & Bodroastuti, T. (2012). Faktor-Faktor Yang Mempengaruhi Produktivitas Kerja (Studi Pada Karyawan Bagian Produksi PT Mazuvo Indo). Jurnal Kajian Akuntansi dan Bisnis, 1(1), 103261. https://www.neliti.com/publications/103261/

Nofriagi, D. R. (2021). Perancangan Jalur Ganda (Double Track) Jalan Rel Ruas Kiaracondong–Cicalengka Untuk Meningkatkan Kapasitas Lintas Kereta (Doctoral Dissertation, Universitas Pendidikan Indonesia).https://repository.upi.edu/66541/4/S_TS_1604928_Chapter3.pdf

Norjana, N., & Zulfiati, R. (2020). Analisa produktivitas tenaga kerja terhadap pekerjaan kolom dan balok beton bertulang. Jurnal Talenta Sipil, 3(2), 82-86. https://doi.org/10.33087/talentasipil.v3i2.33

Nurhendi, R., & Bastam, M. N. (2023). Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi: Tinjauan Literatur. Jurnal Teknik Sipil, 13(1), 53-65. https://doi.org/10.36546/tekniksipil.v13i1.965

Putri, O. Y., Parabang, M., & Maulana, H. (2021). Analisa Waktu dan Biaya Berdasarkan Produktivitas Tenaga Kerja Proyek Pembangunan Jalan Penghubung Jembatan Kuranji. Journal of Applied Engineering Scienties, 4(2), 046-059. https://ojs-ft.ekasakti.org/index.php/JAES/article/view/69

Riskillah, M. I. (2014). Pengaruh Kepemimpinan, Motivasi, Lingkungan Kerja, Pendidikan Dan Latihan Terhadap Produktivitas Karyawan Pt. Adimulya Agro Lestari (Doctoral dissertation, Universitas Islam Negeri Sultan Syarif Kasim Riau). http://repository.uin-suska.ac.id/id/eprint/4187

Roesdiana, T. (2020). Analisis Kerusakan Jalan Rel Wilayah UPT Resor Jalan Rel 3.13 Tanjung Berdasarkan Hasil Kereta Ukur. Jurnal Konstruksi dan Infrastruktur: Teknik Sipil dan Perencanaan, 5(1). http://dx.doi.org/10.33603/jki.v5i1.3775

Saaty, T. L. (2008). Decision Making With The Analytic Hierarchy Process. International Journal Of Services Sciences, 1(1), 83-98. https://doi.org/10.1504/ijssci.2008.017590

Santoso, A., Rahmawati, R., & Sudarno, S. (2016). Aplikasi Fuzzy Analytical Hierarchy Process untuk Menentukan Prioritas Pelanggan Berkunjung Ke Galeri (Studi Kasus Di Secondhand Semarang). Jurnal Gaussian, 5(2), 239-248. https://doi.org/10.14710/j.gauss.5.2.239-248

Urva, G., & Aminah, S. (2022). Implementasi Metode AHP (Analytic Hierarchy Process) dalam Pemilihan Proyek Kontruksi. Jurnal Unitek, 15(2), 141-150. https://doi.org/10.52072/unitek.v15i2.405

Wirawan, W. A., Wahjono, H. B., & Rozaq, F. (2020). Desain Prototype Teknologi Automatic Surface Treatmen Untuk Meningkatkan Ketahanan Jalan Rel Kereta Api. Jurnal Perkeretaapian Indonesia (Indonesian Railway Journal), 4(1). https://doi.org/10.37367/jpi.v4i1.98

Yurizal, M. (2023). An Analysis of Factors Affecting Labor Productivity of Upper Structure Work on the Hurun Beach Resort Project Using the AHP (Analytic Hierarchy Process). Journal of Engineering and Scientific Research, 5(1). https://doi.org/10.23960/jesr.v5i1.129

Published

2025-02-07

How to Cite

Putri, W. N. A., Usman, K., & Siregar, A. M. (2025). Analisis Faktor yang Mempengaruhi Produktivitas Tenaga Kerja dengan Fuzzy AHP pada Proyek Bantalan Beton Divre IV Tanjungkarang . Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(1), 161–171. https://doi.org/10.32832/komposit.v9i1.17563

Issue

Section

Articles