Rekayasa Nilai dalam Tahap Reviu Perencanaan Konstruksi (Studi Kasus: Pelabuhan Perikanan Terintegrasi di PPN Pengembangan Bali)
DOI:
https://doi.org/10.32832/komposit.v10i1.20677Keywords:
value engineering, Analytical Hierarchy Process, planning reviewAbstract
The ongoing construction of the project requires a fairly large allocation of funds, and it is necessary to reconsider whether the design used is optimal. This can be done by reviewing the project planning design so that it is possible to make cost savings by identifying and reducing unnecessary costs without reducing the level of quality, reliability and function of the project itself. Carrying out value engineering techniques, namely carrying out cost analyzes by comparing the costs per item with the details of each job from the contractor's offer to find the cheapest price up to the negotiation stage for cost savings and efficiency. The AHP (Analytic Hierarchy Process) method can be used as a solution to problems in finding decisions, and for assessment using a Likert scale questionnaire. Value engineering in the planning review by taking a case study of an ongoing project in the Pengambengan area of Bali, namely the integrated fishing port project. There are 3 alternatives compared to the planning budget, namely breakdown analysis techniques (Work Breakdown Structure), cost modeling techniques (Cost modeling techniques), and Delphi techniques (Delphi Teqhnique). In value engineering, you can see the price comparison for each work item for planning reviews. The results for the final review based on value engineering RAB planning estimate Rp. 1,626,877,637,500. The stages in the AHP method analysis are determining the objective of the analysis, namely value engineering in selecting contractors, determining the analysis criteria: Cost Budget Plan, Detailed Drawings, Technical Specifications, and Implementation Time, as well as determining alternative options
References
Ainayyah, R. A. & Rhomaita, R. (2022). Penerapan Value Engineering pada Proyek Jembatan (Studi Kasus: Proyek Pembangunan Jembatan Progo - Kranggan, Cs). Undergraduate Thesis. Universitas Islam Sultan Agung. https://repository.unissula.ac.id/25737/
Dell’Isola, A. J. (1997). Value Engineering: Practical Applications -- For Design, Construction, Maintenance & Operations. R.S. Means Co. https://tinyurl.com/DellIsola
ElMarkaby, A., Sanad, A., Elyamamy, A., & Yehia, E. (2023). Multi‑Criteria Decision Support System for Bridge Construction System Selection Utilizing Value Engineering and TOPSIS. Innovative Infrastructure Solutions, 203(8), 295. https://doi.org/10.1007/s41062-023-01267-7
Ervianto, W. I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi. Andi.
Fathi, E. A., Taher, S. E. D., & Mahfouz, S. Y. (2020). Value engineering analysis of RC roadway bridges assimilating environmental impact. HBRC Journal, 16(1), 207-226. https://doi.org/10.1080/16874048.2020.1794348
Ginting, L. H., & Nusa, A. B. (2023). Analisa Value Engineering pada Proyek Pembangunan Puskesmas Medan Johor. Buletin Utama Teknik, 18(2), 204–208. https://doi.org/10.30743/BUT.V18I2.6682
Mardiaman, M., & Simarmata, F. (2021). Pemilihan Metode Pembongkaran Gedung Bertingkat Menggunakan Analytical Hierarchy Process. Jurnal Rekayasa Teknik Sipil Dan Lingkungan - Centech, 2(2), 108–117. https://doi.org/10.33541/CEN.V2I2.3364
Maulana, A. (2023). Analisis Penerapan Rekayasa Nilai (Value Engineering Study) pada Komponen Struktur Bangunan Gedung Kementerian Hukum dan Hak Asasi Manusia Kantor Wilayah NTB. Universitas Mataram.
Mc. George, D., Palmer, A., & Zou, P. X. W. (2012). Construction Management New Direction (3rd ed.). Wiley - Blackwell. https://www.wiley.com/en-br/Construction+Management%3A+New+Directions%2C+3rd+Edition-p-9780470674017
Meillyta, M., Fatimah, A., & Zulfahmi, Z. (2023). Multi-Criteria Analysis Method For Determining The Priority of Bridge Construction. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil , 7(1), 53–59. https://doi.org/10.32832/KOMPOSIT.V7I1.9011
Miles, M. B., & Huberman, A. M. (n.d.). Qualitative Data Analysis: A Methods Sourcebook - . Retrieved June 13, 2025, from https://books.google.co.id/books?id=p0wXBAAAQBAJ&printsec=frontcover&hl=id#v=onepage&q&f=false
Palmer, A., & Kelly, J. (1996). Holistic Appraisal of Value Engineering in Construction in United States. Journal of Construction Engineering and Management. https://ascelibrary.org/doi/10.1061/%28ASCE%290733-9364%281996%29122%3A4%28324%29
Rani, H. A. (2024). Value Engineering Concept in Construction Project Management. B P International. https://doi.org/10.9734/BPI/MONO/978-81-975317-6-7
Ranto, M. A., Fahriana, N., & Basrin, D. (2024). Analisa Pemilihan Moda Transportasi Kota Medan – Bandara Kualanamu Menggunakan Metode Analytical Hierarchy Process (AHP). Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 8(2), 355–360. https://doi.org/10.32832/komposit.v8i2.15144
Saaty, T. L. (1994). The Analytical Hierarchy Process: Decision Making in Economic, Political, Social, and Technological Environments. McGraw-Hill International Book, Co. https://books.google.co.id/books/about/The_Analytic_Hierarchy_Process.html?id=Xxi7AAAAIAAJ&redir_esc=y
Suhendar, T., Mardiaman, M., Azhar, M., & Taqwa, F. M. L. (2025). Studi Perbandingan Biaya pada Pekerjaan Pembongkaran Balok Girder di Proyek Penggantian Jembatan Cinagara. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(1), 151–159. https://doi.org/10.32832/komposit.V9I1.17332
Yanita, R., & Mochtar, K. (2021). Legal Aspect of Value Engineering Implementation in Jakarta (Indonesia) Construction Projects. International Journal of Construction Management, 21(2), 131–139. https://doi.org/10.1080/15623599.2018.1511946
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms (Penulis yang mengajukan publikasi artikel telah menyetujui hal berikut):
- Through this publication, the author agree to submit the copyright of article writing to Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. This copyright submission takes the form of, but is not limited to: reproduction of the article and parts therein, including photographic reproductions; distribution of articles through printed and electronic documents; and translation of articles(Bahwa melalui publikasi ini, hak cipta penulisan artikel diserahkan kepada Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. Penyerahan hak cipta ini berupa, namun tidak terbatas pada: perbanyakan artikel dan bagian di dalamnya, termasuk reproduksi fotografi; penyebarluasan artikel melalui dokumen cetak dan elektronik; serta penterjemahan artikel).
- The authors agree to the terms of the Copyright Notice, according to Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License., which will apply to this article if and when it is published by Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. (Para penulis setuju dengan ketentuan Pemberitahuan Hak Cipta, sesuai dengan Lisensi Internasional Creative Commons Attribution-NonCommercial-ShareAlike 4.0., yang akan berlaku untuk artikel ini jika dan ketika diterbitkan oleh Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil).

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

.png)









