Analisis Kinerja Konsultan Manajemen Konstruksi Proyek EPC pada Pembangunan Fasilitas Pengolahan Batu Bara di Tanjung Enim, Sumatera Selatan
DOI:
https://doi.org/10.32832/komposit.v10i1.21713Keywords:
EPC Project Performance, Construction Management Consultant, Expert Competency, Quality Management, Project CommunicationAbstract
Engineering, Procurement, and Construction (EPC) projects face complex challenges such as multidisciplinary coordination, tight schedules, material procurement risks, and design change dynamics, which require the crucial role of Construction Management Consultants (CMCs) in ensuring the achievement of time, cost, and quality targets. This study analyzes the influence of expert competence, quality management, and communication on CMC performance in the coal processing facility construction project in Tanjung Enim, South Sumatra. The study employs a quantitative approach using research instruments developed based on indicators of expert competence, quality management, and communication. Instrument validation was conducted using item analysis with Pearson's product-moment correlation coefficient, while reliability was measured using Cronbach's Alpha coefficient. Data were analyzed using partial correlation and multiple regression techniques. The results of the study indicate: (1) Expert competence has a significant positive effect on KMK performance (ry1 = 0.377 > 0) with the regression equation Ŷ = 19.843 + 0.144 X1; (2) Quality management has a significant effect (ry2 = 0.543 > 0) with the equation Ŷ = 19.040 + 0.174 X2; (3) Communication makes an important contribution (ry3 = 0.471 > 0) with the equation Ŷ = 19.590 + 0.152 X3. Multiple regression analysis shows that the three variables together explain 82% of the variance in performance (ry123 = 0.9272 > 0) with the equation Ŷ = 3.9547 + 0.200 × X1 + 0.1995 × X2 + 0.2237 × X3. These findings confirm that the performance of construction management consultants on EPC projects is significantly influenced by expert competence, quality management, and communication. The study recommends the need for standardization of competencies, implementation of an integrated quality management system, and development of an effective communication model to improve the performance of CMC on similar projects.
References
Atapattu, C., Domingo, N., & Sutrisna, M. (2023). Causes and Effects of Cost Overruns in Construction Projects. Proceedings of the 45th AUBEA Conference, January, 14–23.
Bhattarai, S. S., Kisi, K. P., & Kayastha, R. (2022). Contractors’ Claims in an EPC and Turnkey Contract: Lessons Learned from a Hydropower Project. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(2), 05022011. https://doi.org/10.1061/JLADAH.LADR-915
FIDIC. (2017). EPC/Turnkey Contract 2nd Ed (2017 Silver Book). Fédération Internationale des Ingénieurs-Conseils (FIDIC).
Iskandar, I., Hardjomuljadi, S., & Sulistio, H. (2021). The Most Influencing Factors on the Causes of Construction Claims and Disputes in the EPC Contract Model of Infrastructure Projects in Indonesia. Review of International Geographical Education Online, 11(2), 80–91. https://doi.org/10.33403/rigeo.800441
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2018). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 22/PRT/M/2018 Tahun 2018 tentang Pembangunan Bangunan Gedung Negara. https://peraturan.bpk.go.id/Details/159730/permen-pupr-no-22prtm2018-tahun-2018
Morad, A. M. M. E.-S. S. (2023). An Analysis of Global Construction Projects: Causes and Implications of Cost Overruns. International Journal of Innovative Science and Research Technology, 1(1), 1–10. https://doi.org/https://doi.org/10.31219/osf.io/sjyn6
Nazella, P. V. (2023). Evaluasi Kompetensi Tenaga Konsultan Pengawas pada Pelaksanaan Proyek Konstruksi [Universitas Andalas]. http://scholar.unand.ac.id/216092/
Nurmahani, I. (2021). Tanggung Gugat Konsultan Pengawas Konstruksi dalam Pekerjaan Terintegrasi Pengadaan Barang/Jasa Pemerintah. Jurist-Diction, 4(5), 1791–1814. https://doi.org/10.20473/JD.V4I5.29819
Rehman, M. S. U., Shafiq, M. T., Thaheem, M. J., & Albattah, M. (2022). A Case Study of Implementing Project Management Processes in EPC Contracts. 12th International Conference on Engineering, Project, and Production Management (EPPM2022). https://www.researchgate.net/publication/371990373_A_Case_Study_of_Implementing_Project_Management_Processes_in_EPC_Contracts
Riyadi, S., Taqwa, F. M. L., Brillianto, A. G., & Simanjuntak, M. R. A. (2024). Analisis Implementasi Teknologi Building Information Modelling (BIM) pada Tahap Perencanaan Bangunan Gedung Istana Kepresidenan Ibu Kota Nusantara (Studi Kasus PT Yodya Karya, Persero). Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 8(2), 279–288. https://doi.org/10.32832/KOMPOSIT.V8I2.15450
Sarwani, Baihaqi, I., & Utomo, C. (2024). Causes of Delay in EPC Projects: The Case of Indonesia. International Journal on Advanced Science, Engineering and Information Technology, 14(2), 618–628. https://doi.org/10.18517/IJASEIT.14.2.19744
Umar, A. A. A. F., & Simanjuntak, M. R. A. (2020). Analisis Risiko Metode Konstruksi Design and Build terhadap Waktu Pelaksanaan Proyek pada Pembangunan Gedung PT. ABC. Prosiding Seminar Nasional Teknik Sipil UMS. http://publikasiilmiah.ums.ac.id/handle/11617/12154
Willy, Y., & Sekarsari, J. (2020). Analisis Aspek Sumber Daya Manusia Terhadap Kinerja Pekerja Proyek Konstruksi. JMTS: Jurnal Mitra Teknik Sipil, 3(3), 523. https://doi.org/10.24912/jmts.v3i3.8392
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms (Penulis yang mengajukan publikasi artikel telah menyetujui hal berikut):
- Through this publication, the author agree to submit the copyright of article writing to Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. This copyright submission takes the form of, but is not limited to: reproduction of the article and parts therein, including photographic reproductions; distribution of articles through printed and electronic documents; and translation of articles(Bahwa melalui publikasi ini, hak cipta penulisan artikel diserahkan kepada Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. Penyerahan hak cipta ini berupa, namun tidak terbatas pada: perbanyakan artikel dan bagian di dalamnya, termasuk reproduksi fotografi; penyebarluasan artikel melalui dokumen cetak dan elektronik; serta penterjemahan artikel).
- The authors agree to the terms of the Copyright Notice, according to Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License., which will apply to this article if and when it is published by Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. (Para penulis setuju dengan ketentuan Pemberitahuan Hak Cipta, sesuai dengan Lisensi Internasional Creative Commons Attribution-NonCommercial-ShareAlike 4.0., yang akan berlaku untuk artikel ini jika dan ketika diterbitkan oleh Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil).

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

.png)