Identifikasi Risiko Keselamatan dan Kesehatan Kerja pada Proyek Pembangunan Sekolah SMPN 2 Mengwi, Badung, Bali
DOI:
https://doi.org/10.32832/komposit.v10i2.21733Keywords:
Construction Safety Management System, hazard identification, risk assessment, risk controlAbstract
This study aims to identify hazards, assess risks, and determine risk controls in the SMPN 2 Mengwi construction project as part of implementing the Construction Safety Management System (CSMS). The project site shows minimal implementation of occupational safety and health (OSH) with significant accident risks, thus requiring systematic hazard identification and risk assessment following the stages of hazard identification, risk assessment, and risk control. Data were collected through surveys, interviews, field observations, and questionnaires, analyzed using SPSS for validity and reliability. The results indicate that the risk levels are 81.71% low, 11.79% medium, and 6.50% high. Risk control is carried out through the use of personal protective equipment (PPE), worker training, safe work area arrangements, and installation of physical barriers. This study provides insights into effective CSMS implementation to create a safe and productive construction work environment.
References
Ananti, G. A. A., Indrayanti, A. P., & Setyono, E. Y. (2019). Analisis Biaya Keselamatan dan Kesehatan Kerja (K3) pada Proyek Kontruksi (Studi Kasus: Pembangunan Gedung Lt. II SD N 13 Kesiman). Seminar Nasional Keteknisipilan Bidang Vokasional VII, I, 247–251. https://ojs.pnb.ac.id/index.php/Proceedings/article/view/1696
Berferik, R., Andiyan, A., Zulkarnain, I., Munizu, M., Samosir, J. M., Afriyadi, H., Rusmiatmoko, D., Adichandra, I., Syamil, A., Ikhsan, M., & Prasetyo, A. (2023). Manajemen Proyek: Teori & Penerapannya (E. Efitra, S. Sepriano, & A. F. Amani (eds.); Issue June). Sonpedia Publishing Indonesia.
BPJS Ketenagakerjaan, & Gunawan, A. (2021). BPJS Ketenagakerjaan Catat 65,89 Persen Kecelakaan Terjadi di Dalam Lokasi Kerja. BPJS Ketenagakerjaan. https://www.bpjsketenagakerjaan.go.id/berita/27663/B
Darmawi, H. (2022). Manajemen Risiko (S. Suryani (ed.); 2nd ed.). Bumi Aksara. https://books.google.co.id/books?id=Nz1lEAAAQBAJ&printsec=copyright&hl=id#v=onepage&q&f=false
Ervianto, W. I. (2002). Manajemen Proyek Konstruksi. Andi. https://books.google.co.id/books/about/MANAJEMEN_PROYEK_KONSTRUKSI.html?id=jHLDEAAAQBAJ&redir_esc=y
Hanun, F., Situmorang, R., Fauzi, A., Lhara Sari, O., Studi, P., Sipil, T., & Kalimantan, I. T. (2025). Penilaian Manajemen Risiko K3 menggunakan Metode Severity Index pada Proyek Pembangunan Gedung Laboratorium Terpadu II ITK. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(2), 445–456. https://doi.org/10.32832/komposit.V9I2.17007
Mauliana, Y., & Kusuma, A. P. (2025). Manajemen Pengendalian Risiko pada Proyek Pembangunan Gedung Perpustakaan Bandar Lampung dengan Metode IBPRP. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(2), 381–392. https://doi.org/10.32832/komposit.v9i2.19067
Negarawan, D. R., & Prastawa, H. (2023). Identifikasi Bahaya dan Penilaian Risiko K3 pada Pabrik Tahu di Kelurahan Kalibata. Industrial Engineering Online Journal, 12(3), 1–12. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/40330
Pajri, S., Widyatami, F. S., & Mentari, S. (2023). Analisis Faktor yang Mempengaruhi Penerapan K3 (Keselamatan dan Kesehatan Kerja) Konstruksi Pembangunan Gedung Resto Apung Muara Angke. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 7(2), 275–282. https://doi.org/10.32832/komposit.v7i2.14392
Peraturan Kementrian PUPR No. 10 Tahun 2021 Tentang Pedoman Sistem Manajemen Keselamatan Konstruksi, Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia 95 (2021).
Peraturan Pemerintah No. 14 Tahun 2021 Tentang Jasa Konstruksi, Kementerian Pekerjaan Umum 1 (2021).
Rani, H. A. (2016). Manajemen Proyek Konstruksi. Deepublish.
Simanjuntak, M. R. A., Silalahi, A. P., & Muntako, F. (2022). Analisis Komponen Biaya SMKK Proyek Pembangunan Stadion Banten Sesuai Permen PUPR Nomor 10 Tahun 2021 (Cost Component Analysis of SMKK Banten Stadium Development Project According to Permen PUPR Number 10 Year 2021). Researchgate, 10, 0–11.
Susiloningtyas, R., Pujiati, A., Harahap, S., Dano, D., Rosaria, D., Yamin, Y., Wahyuni, L., Hamzah, A., Pranyoto, S. E., Rely, G., Hartatik, H., Rizki, M., & Hidayatullah, H. (2023). Manajemen Risiko (H. Hidayatullah (ed.)). CV. Eureka Bina Aksara.
Taqwa, F. M. L., Priyambodo, B., Subkhan, S., & Naibaho, P. R. T. (2025). Analysis of the Effect of Evaluation and Innovation in the Development of Construction Safety Culture on the Safety Leadership Model using SEM Approach. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(2), 311–326. https://doi.org/10.32832/komposit.v9i2.20134
Waromi, M., Mabui, D. S., & Mayaindrawati, C. (2025, July). Analisis Komponen Biaya SMKK Menurut Permen PUPR Nomor 10 Tahun 2021. In Prosiding: Seminar Nasional Teknik Sipil Universitas Yapis Papua (Vol. 4, No. 1, pp. 422-427). https://snts.ftuniyap.ac.id/index.php/prosiding/article/view/152
Widjaja, D., Anton, A., Rezeki, R., Tjendana, M., & Sunijati, E. (2024). Motivasi dapat Memediasi Kompensasi dan Pelatihan terhadap Kinerja Karyawan (Studi Pada PT. Pacifik Medan Industri). Jurnal Manajemen Dan Bisnis, 24(2), 210–220. https://ejournal.ust.ac.id/index.php/JIMB_ekonomi/article/view/4034
Widodo, S. E. (2015). Manajemen Pengembangan Sumber Daya Manusia. Pustaka Belajar. https://perpustakaan.binadarma.ac.id/opac/detail-opac?id=2543
Yuliana, N. P. I., Suartika Putra, I. G. P. A., Yuni, N. K. S. E., & Sudiarta, I. K. (2024). Kajian Biaya Penerapan Sistem Manajemen Keselamatan Konstruksi pada Proyek Villa Banana di Kabupaten Badung. Jurnal Talenta Sipil, 7(1), 173. https://doi.org/10.33087/talentasipil.v7i1.424
Yuliana, N. P. I., & Yuni, N. K. S. E. (2020). Analisis Anggaran Biaya Keselamatan Dan Kesehatan Kerja Proyek Konstruksi Gedung SMA N 2 Abiansemal. Paduraksa: Jurnal Teknik Sipil Universitas Warmadewa, 9(2), 201–211. https://doi.org/10.22225/pd.9.2.1792.201-211
Zulma, N., Dewita, H., & Sembiring, K. (2025). Analisis Program Keselamatan dan Kesehatan Kerja (K3) serta Pengaruh terhadap Keberhasilan Proyek Pembangunan Gedung PT. Petrokimia Gresik. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(1), 109–114. https://doi.org/10.32832/komposit.v9i1.16450
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms (Penulis yang mengajukan publikasi artikel telah menyetujui hal berikut):
- Through this publication, the author agree to submit the copyright of article writing to Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. This copyright submission takes the form of, but is not limited to: reproduction of the article and parts therein, including photographic reproductions; distribution of articles through printed and electronic documents; and translation of articles(Bahwa melalui publikasi ini, hak cipta penulisan artikel diserahkan kepada Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. Penyerahan hak cipta ini berupa, namun tidak terbatas pada: perbanyakan artikel dan bagian di dalamnya, termasuk reproduksi fotografi; penyebarluasan artikel melalui dokumen cetak dan elektronik; serta penterjemahan artikel).
- The authors agree to the terms of the Copyright Notice, according to Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License., which will apply to this article if and when it is published by Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. (Para penulis setuju dengan ketentuan Pemberitahuan Hak Cipta, sesuai dengan Lisensi Internasional Creative Commons Attribution-NonCommercial-ShareAlike 4.0., yang akan berlaku untuk artikel ini jika dan ketika diterbitkan oleh Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil).

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

.png)











