Analisis Time Cost Trade Off sebagai Strategi Percepatan Proyek untuk Efisiensi Pembangunan Gedung Laboratorium Teknik 4 Institut Teknologi Sumatera

Authors

DOI:

https://doi.org/10.32832/komposit.v10i1.22126

Keywords:

Time Cost Trade-Off, Project Acceleration, Efficiency , Time, Cost

Abstract

Project delays in construction are complex issues that have a significant impact on increasing costs and completion time. This study aims to analyze the optimal project acceleration strategy for the construction of the Engineering Laboratory Building (GLT) 4 at ITERA, which is experiencing delays, by applying the Time Cost Trade Off (TCTO) method. This quantitative research compares three alternative acceleration strategies: adding working hours (overtime), adding work shifts, and adding labor and heavy equipment. Primary data was obtained through interviews with the contractor, while secondary data included the time schedule, the Budget Plan (RAB), and other project documents. The analysis was conducted by compiling a critical work network, calculating normal duration and costs, and analyzing the crash duration and crash cost for each alternative. The results show that the project's normal condition has a duration of 224 days with a total cost of Rp 16,927,594,301. All three acceleration strategies proved effective in reducing both duration and cost. The strategy of adding labor and heavy equipment proved to be the most optimal, resulting in a duration of 163 days (time efficiency of 27.23%) with the highest cost efficiency of 5.75%. The alternative of adding work shifts resulted in the fastest duration of 161 days (time efficiency of 28.13%), but with lower cost efficiency (4.92%). Meanwhile, adding overtime hours was the weakest alternative with a duration of 178 days (time efficiency of 20.54%) and a cost efficiency of 3.51%. The research confirms that adding resources (labor and equipment) provides the most beneficial time-cost trade-off for this project, where the indirect cost savings from shortening the heavy equipment rental period are greater than the additional direct costs.

References

Astuti, R. D., Chayati, N., & Taqwa, F. M. L. (2018). Pengendalian Waktu Proyek pada Pembangunan Atap Stadion Renang Aquatic Senayan dengan Metode Critical Path Method. Prosiding Seminar Nasional Pascasarjana, Departemen Teknik Sipil FT-UI, Depok. https://tinyurl.com/waktu-raastuti

Christalisana, C. (2018). Pengaruh Pengalaman dan Karakter Sumber Daya Manusia Konsultan Manajemen Konstruksi terhadap Kualitas Pekerjaan pada Proyek di Kabupaten Pandeglang. Fondasi : Jurnal Teknik Sipil, 7(1). https://doi.org/10.36055/JFT.V7I1.3305

Dayunita, W., Pramanda, H., Ariansyah, D., & Bunyamin, B. (2024). Analisa Penambahan Waktu Kerja (Jam Lembur) terhadap Biaya Pelaksanaan Proyek dengan Metode Time Cost Trade Off (Study Kasus Gedung Badan Kepegawaian Aceh). Journal of Planning and Research in Civil Engineering, 3(3), 452–458. https://doi.org/10.55616/prince.V3I3.841

Dwijono, D. (2017). Optimalisasi Waktu Percepatan dan Biaya Kegiatan di dalam Metode Jalur Kritis dengan Pemrograman Linier. Jurnal Terapan Teknologi Informasi, 1(1). https://doi.org/10.21460/JUTEI.2017.11.4

Erfaliani, A. P., Pradika, J. D., Hendriyani, I., & Pratiwi, R. (2024). Analisis Waktu dan Biaya pada Proyek Pembangunan Pasar Induk Senaken Kabupaten Paser dengan Metode Time Cost Trade Off (TCTO). Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 8(2), 297–308. https://doi.org/10.32832/komposit.v8i2.15938

Hermawan, M. R., Ridwan, A., & Suwarno, S. (2021). Mengurangi Durasi Pelaksanaan Proyek Dengan Menggunakan Metode Time Cost Trade Off. Jurnal Manajemen Teknologi & Teknik Sipil, 4(2), 13–26. https://doi.org/10.30737/jurmateks.v4i2.1829

Indrayani, N. L. A. (2022). Penerapan Sistem Enterprise Resource Planning (ERP) pada Perusahaan Jasa Konstruksi. CRANE: Civil Engineering Research Journal, 3(2), 11–16. https://doi.org/10.34010/crane.v3i2.8159

Kustiani, I., Siregar, A. M., & Mela, A. F. (2016). Analisis Time Cost Trade Off untuk Mengejar Keterlambatan Pelaksanaan Proyek di Bandar Lampung. Jurnal Rekayasa Teknik Sipil Universitas Lampung, 20(2). http://ft-sipil.unila.ac.id/ejournals/index.php/jrekayasa/article/view/238

Laksana, B. I., Wijatmiko, I., & Hasyim, M. H. (2018). Aplikasi Metode Time Cost Trade Off Untuk Mengoptimalkan Waktu Dan Biaya Pekerjaan Proyek Pada Pembangunan Gedung Pengairan Universitas Brawijaya. Jurnal Mahasiswa Jurusan Teknik Sipil, 1(3), 1209–1214. https://sipil.studentjournal.ub.ac.id/index.php/jmts/article/view/736

Maulana, F., Handayani, T. N., & Sulistyo, D. (2024). Implementasi Metode Time Cost Trade-Off Pembangunan Gedung Pabrik Manufaktur (Studi Kasus: Proyek Pembangunan Pabrik PT. Atmi Kreasi Prima). Simposium Nasional Teknologi Infrastruktur, 23(4), 5641–5646. https://doi.org/10.26418/JTS.V23I4.71535

Nurafifah, N. M., Dewita, H., & Sembiring, K. (2025). Analisis Waktu pada Pekerjaan Tambahan Proyek Pembangunan Gedung PT. Petrokimia Gresik. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(1), 101–108. https://doi.org/10.32832/komposit.v9i1.16449

Nurhikmah, S., Dewita, H., & Sembiring, K. (2025). Analisis Biaya dan Waktu Percepatan Proyek Pembangunan Rusun At-Tanwir Cianjur dengan Penambahan Jam Kerja Menggunakan Metode TCTO. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 9(2), 283–292. https://doi.org/10.32832/komposit.v9i2.17785

Risfawany K. S., L. D., Latupeirissa, J. E., & Mandoa, C. (2025). Perbandingan Efisiensi Waktu dan Tenaga Kerja Menggunakan Metode Time Trade Off. Jurnal Karajata Engineering, 5(2), 197–208. https://doi.org/10.31850/karajata.v5i2.3896

Salindeho, C. G., Pratasis, P. A. K., & Sumanti, F. P. Y. (2022). Optimasi Waktu Dan Biaya Menggunakan Metode Time Cost Trade Off pada Proyek Peningkatan Ruas Jalan Tondano - Kembes - Manado Seksi II. TEKNO, 20(81). https://doi.org/10.35793/JTS.V20I81.42087

Saragi, T. E., & Situmorang, R. U. A. (2022). Optimasi Waktu Dan Biaya Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dengan Alternatif Penambahan Tenaga Kerja Dan Jam Kerja (Lembur) (Studi Kasus : Pembangunan Gedung Convention Hall Kab. Deli Serdang). Construct: Jurnal Teknik Sipil, 1(2), 53–69. http://repository.uhn.ac.id/handle/123456789/6146

Zhaputro, M. A. D., Darjanto, H., & Nugrahini, F. C. (2024). Penerapan Metode Time Cost Trade Off untuk Optimasi Biaya dan Waktu pada Pengaruh Redesign Struktur Bawah (Studi Kasus: Proyek Pembangunan Klinik Utama Mata Jec Java @Pasuruan Tahap 1). Journal of Manufacturing in Industrial Engineering & Technology, 3(2), 93–106. https://doi.org/10.30651/mine-tech.v3i2.24621

Published

2026-01-30

How to Cite

Septi, F. T., & Sari, D. P. (2026). Analisis Time Cost Trade Off sebagai Strategi Percepatan Proyek untuk Efisiensi Pembangunan Gedung Laboratorium Teknik 4 Institut Teknologi Sumatera. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 10(1), 1–8. https://doi.org/10.32832/komposit.v10i1.22126

Issue

Section

Articles