A highly productive workforce is essential for a construction project to be successful because worker productivity has a significant impact on the final outcome, especially in the construction industry. Wall plastering is an example of a profession that requires hard work. The aim of this research is to calculate the productivity coefficient for plastering work and compare it with the 2022 Indonesian National Standard Work Unit Price Analysis (AHSP SNI) in order to measure the efficiency of wall plastering at work sites. This research was carried out by collecting primary data regarding the efficiency of plastering work at the Basic Laboratory Building at Samudra University through field observations and interviews. Productivity factor analysis of wall plastering work shows an average of 47.61 m2 per day for foremen and head craftsmen, 13.88 m2 per day for craftsmen, and 22.72 m2 per day for assistant craftsmen. Apart from that, the foreman and head craftsman produce 66.66 m2 per day, the craftsman produces 6.66 m2 per day, and the assistant craftsman produces 3.33 m2 per day according to SNI AHSP. Thus, the difference in percentages obtained for the foreman and head craftsman respectively is 28.57%, for the craftsman 52.01%, and for the assistant craftsman 85.34%.

Key words:Builder Productivity, Wall Plastering, Building Projects.

References

Abriyani, & Puspaningsih. (2014). Faktor-Faktor yang Berpengaruh terhadap Kepuasan Kerja dan Kinerja Manajer Perusahaan Manufaktur. Jurnal Akutansi Dan Auditing,Indonesia, Jakarta, 11(2).

Andardi, F. R. (2019). Studi Pekerjaan Pasangan Plesteran, Acian dan Pengecatan Berdasarkan Produktivitas Jumlah Tenaga Kerja dengan Metode Work Study (SDN Dumajah 02 Tanah Merah-Bangkalan). Seminar Nasional Teknologi dan Rekayasa (SENTRA), 2, 51–59.

Ervianto, W. I. (2009). Pengukuran Produktivitas Kelompok Pekerja Bangunan dalam Proyek Konstruksi (Studi Kasus Proyek Gedung Bertingkat di Surakarta). Jurnal Teknik Sipil Universitas Atma Jaya Yogyakarta, 9(1), 31–42.

Fachreza. (2017). Analisis Produktivitas Jumlah Tenaga Kerja pada Pekerjaan Pasangan Bata dengan Metode Work Study (Studi Kasus Pembangunan Perumahan Grand Mahakam Kota Samarinda). Jurnal Mahasiswa Jurusan Teknik Sipil Universitas Brawijaya, Indonesia, 1(2), 20–29.

Hasanah, E. U., & Widowati, P. (2011). Analisis Produktivitas Tenaga Kerja pada Industri Rumah Tangga Krecek di Kelurahan Segoroyoso. Efektif Jurnal Bisnis Dan Ekonomi, 2(2), 169–182.

Hutaisot, J. P. (2017). Analisis Produktivitas Tenaga Kerja Kontruksi Ppada Pekerjaan Pasangan Lantai Keramik dan Plesteran Dinding menggunakan metode work sampling. Jurnal Sipil Statik, 5(4), 205–215.

Lutfi, M., & Subtoni, S. (2020). Kajian Struktur Bangunan Akibat Penurunan Mutu Beton pada Kolom Terpasang (Studi Kasus: SDN 01 Cikaret Kabupaten Bogor). Astonjadro: CEAESJ, 6(2), 115–129.

Mandani, T. (2010). Analisis Produktivitas Tenaga Kerja pada Pekerjaan Pasangan Bata (Studi Kasus Proyek Pembangunan Rumah Sakit Dr. Moewardi, Sukarta, Jawa Tengah). Jurnal Mahasiswa Universitas Sebelas Maret, 20(4), 105–115.

Nico, H. (2016). Analisa Produktivitas Jumlah Tenaga Kerja pada Pekerjaan Pasangan Bata Dengan Metode Work Study. Jurnal Mahasiswa Teknik Sipil, 1(2), 52–60.

Pranata, R. R. (2015). Analisa Produktivitas Pekerjaan Dinding Panel, Dinding Batu Bata Konvensional, dan SNI Pekerjaan Dinding. Jurnal Mahasiswa Jurusan Teknik Sipil, 1(2), 233–243.

Ramadhan, R., & Sigit, A. (2020). Analisis Produktivitas Tenaga Kerja pada Pekerjaan Plesteran Proyek Gedung FIAI Universitas Islam Indonesia. Jurnal Mahasiswa Universitas Islam Indonesia, 15(2), 15–20.

Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 7(2), 233–240. https://doi.org/10.32832/komposit.v7i2.14240

Subarjo, S. (2015). Faktor-Faktor Yang Mempengaruhi Produktivitas Karyawan pada CV. Granada. Optimum: Jurnal Ekonomi Dan Pembangunan, 5(2), 194. https://doi.org/10.12928/optimum.v5i2.7883

Suyono, B., & Hermawan, H. (2013). Analisis Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Industri Kerajinan Kulit di Kabupaten Magetan. Jurnal Ekomaks, 2(2).

Wicaksono, A. B., & Priyanto, B. (2023). Analisa Produktivitas Tenaga Kerja pada Pekerjaan Fabrikasi Baja pada Fabrikasi Baja Majalengka. Jurnal Sosial dan Teknologi, 3(5), 401-408.

Yuni, P., & Arfian, R. (2005). Analisis Produktivitas Tenaga Kerja pada Pekerjaan Plesteran Dinding dengan Metode Studi Gerak dan Waktu. Jurnal Mahasiswa Teknik Sipil. Yogyakarta: Universitas Islam Indonesia, 2(1), 85–90.

Published

2024-02-02

How to Cite

Jaharuddin, N., Masthura, L., & Firdasari, F. (2024). Analisis Produktivitas Tenaga Kerja pada Pekerjaan Plesteran Dinding dengan Metode Work Study. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 8(1), 197–203. https://doi.org/10.32832/komposit.v8i1.15498

Issue

Section

Articles