| Journal History |
| Editorial Board |
| Review |
| Focus and Scope |
| Publication Ethics |
| Author Guidelines |
| Online Submissions |
| Publication Fee |
| Contact |
Vol. 8 No. 1 (2024)
This issue has been available online since February 2nd, 2024, for the regular issue of February - July 2024. All Articles in this issue were authored/co-authored by 66 Authors from seventeen Universities (Universitas Ibn Khaldun Bogor, Institut Teknologi Kalimantan, Universitas Tanjungpura, Institut Teknologi Bandung, Universitas Islam Lamongan, Universitas Pembangunan Nasional Veteran Jawa Timur, Universitas Muhammadiyah Surakarta, Universitas Jambi, Universitas Tama Jagakarsa, Universitas Warmadewa, Universitas Pembangunan Jaya, Universitas Kristen Indonesia Paulus, Universitas Mercu Buana, Politeknik Perkeretaapian Indonesia Madiun, Universitas Balikpapan, Universitas Sangga Buana YPKP Bandung, and Universitas Samudra).
Articles
-
Analisis Kapasitas Drainase Kawasan Pemukiman di Desa Cihideung Ilir, Kecamatan Ciampea, Kabupaten Bogor
-
This article have been
read 796 times,
downloaded 725 times
PDF (Bahasa Indonesia)
-
-
Perspektif Expert dalam Penentuan Komponen, Elemen dan Sub Elemen pada Pemeliharaan dan Perawatan Bangunan
-
This article have been
read 379 times,
downloaded 311 times
PDF (Bahasa Indonesia)
-
-
Pengaruh Fly Ash PLTU Bengkayang terhadap Sifat Fisis dan Mekanis Bata Beton
-
This article have been
read 488 times,
downloaded 328 times
PDF (Bahasa Indonesia)
-
-
Analisis Kinerja dan Kepentingan Moda Angkutan Bus dan Mobil Travel Agent Rute Simpang Empat – Kota Padang
-
This article have been
read 354 times,
downloaded 249 times
PDF (Bahasa Indonesia)
-
-
Analisis Variabilitas Curah Hujan Daerah Aliran Sungai (DAS) Kali Magok
-
This article have been
read 1203 times,
downloaded 935 times
pdf (Bahasa Indonesia)
-
-
Analisis Perencanaan Tebal Lapis Perkerasan Kaku (Rigid Pavement) (Studi Kasus: Jalan Tanjakan Dramaga, Kabupaten Bogor)
-
This article have been
read 578 times,
downloaded 502 times
pdf (Bahasa Indonesia)
-
-
Determination Analysis of House Units Selling Price at Citra Kencana Residential, Bogor City
-
This article have been
read 265 times,
downloaded 191 times
PDF
-
-
Analisis Biaya pada Implementasi Resource Leveling Tenaga Kerja
-
This article have been
read 731 times,
downloaded 611 times
pdf (Bahasa Indonesia)
-
-
Analisa Kepadatan Tanah Menggunakan Sand Cone pada Peningkatan Struktur Tanggul Pantai di Kota Pekalongan
-
This article have been
read 844 times,
downloaded 1909 times
pdf (Bahasa Indonesia)
-
-
Karakteristik Pemanfaatan Limbah Plastik dan Getah Damar sebagai Bahan Pengganti Aspal pada Perkerasan Lentur
-
This article have been
read 621 times,
downloaded 528 times
pdf (Bahasa Indonesia)
-
-
Analisis Tikungan Spiral-Spiral pada Tikungan Tapal Kuda Cianjur dengan Metode Jarak Pandang Henti
-
This article have been
read 542 times,
downloaded 578 times
pdf (Bahasa Indonesia)
-
-
Analisis Struktur Perbandingan Penggunaan Bekisting Konvensional dengan Bekisting Pelat Baja pada Kolom Kotak dan Kolom Bulat (Studi Kasus Pembangunan Cibinong City Mall 2)
-
This article have been
read 713 times,
downloaded 589 times
pdf (Bahasa Indonesia)
-
-
Perencanaan Jalan Alternatif di Desa Tiyingtali – Tumingal, Kabupaten Karangasem, Provinsi Bali
-
This article have been
read 364 times,
downloaded 291 times
pdf (Bahasa Indonesia)
-
-
Pengaruh Penerapan Kebijakan Low Emission Zone terhadap Perubahan Perilaku Perjalanan Komuter di Kawasan Kotatua Jakarta
-
This article have been
read 475 times,
downloaded 613 times
pdf (Bahasa Indonesia)
-
-
Analisis Manajemen Keselamatan Kebakaran Gedung Berbasis Metode Penilaian Keandalan Sistem Keselamatan Bangunan pada Gedung Green House Display – Badan Riset dan Inovasi Nasional Cibinong Kabupaten Bogor
-
This article have been
read 731 times,
downloaded 705 times
pdf (Bahasa Indonesia)
-
-
Pengaruh Penambahan Limbah Serbuk Besi dan Serbuk Kayu terhadap Kuat Tekan Beton
-
This article have been
read 533 times,
downloaded 549 times
pdf (Bahasa Indonesia)
-
-
Pengaruh Penggunaan Batu Apung sebagai Subtitusi Agregat Kasar pada Beton Geopolimer terhadap Berat Jenis Beton dan Workabilitas
-
This article have been
read 614 times,
downloaded 465 times
pdf (Bahasa Indonesia)
-
-
Analisis penerapan Area Traffic Control System (ATCS) di Pusat Kota Ambon
-
This article have been
read 494 times,
downloaded 552 times
pdf (Bahasa Indonesia)
-
-
Analisis Karakteristik Parkir pada Supermarket di Kota Makassar
-
This article have been
read 356 times,
downloaded 339 times
pdf (Bahasa Indonesia)
-
-
Efektivitas Teknologi LID Model Sumur Resapan untuk Mereduksi Runoff di Perumahan Bumi Citra Asri, Bogor
-
This article have been
read 782 times,
downloaded 597 times
pdf (Bahasa Indonesia)
-
-
Analisis Risiko Pekerjaan Erection Jembatan Kereta Api Menggunakan Metode Fuzzy FMEA
-
This article have been
read 630 times,
downloaded 607 times
pdf (Bahasa Indonesia)
-
-
Pemanfaatan Limbah Lumpur yang Distabilisasi Menggunakan MICP Sebagai Lapisan Penutup Sementara Tempat Pembuangan Akhir
-
This article have been
read 575 times,
downloaded 387 times
pdf (Bahasa Indonesia)
-
-
Analisis Regresi Logistik Multinomial pada Faktor-Faktor yang Mempengaruhi Perilaku Penumpang (Studi Kasus Penumpang Bogor terhadap Perubahan Stasiun Manggarai)
-
This article have been
read 575 times,
downloaded 568 times
pdf (Bahasa Indonesia)
-
-
Evaluasi Kinerja Terminal Tipe A Indihiang Kota Tasikmalaya
-
This article have been
read 630 times,
downloaded 673 times
pdf (Bahasa Indonesia)
-
-
Analisis Produktivitas Tenaga Kerja pada Pekerjaan Plesteran Dinding dengan Metode Work Study
-
This article have been
read 848 times,
downloaded 966 times
pdf (Bahasa Indonesia)
-

.png)












