Analisis Pengaruh Kompetensi Manajer Proyek dan Ahli Supervisi pada Kinerja Proyek Konstruksi Infrastruktur Berkelanjutan di Indonesia
DOI:
https://doi.org/10.32832/komposit.v10i2.23049Keywords:
Project Manager, Supervision expert, Infrastructure Project, project management, Expert CompetencyAbstract
Infrastructure projects are developing to meet the needs of construction infrastructure for the Indonesian people. Therefore, during the construction phase, project managers and supervision consultants are involved in implementing the project. Project performance is always associated with the competence of project implementers, which has become a topic of discussion among experts, because project implementers greatly determine project performance. Project success and failure are closely related to the competence of project managers and supervision consultants. However, most infrastructure project performance issues are only associated with the competence of project managers, which is considered inappropriate because both work together in project implementation. Previous research has focused more on the influence of Project Manager competence, and little has examined the influence of Supervisory Expert competence. This study aims to determine the influence of Project Manager and Supervisory Expert competence on the performance of sustainable infrastructure projects in Indonesia. This research method uses quantitative and qualitative approaches. Competency literature was obtained from the PMCD framework, SKKNI, and previous research. Competency factors were analyzed using matrix and frequency methods. Questionnaires and interviews with a target of 50 Project Manager respondents and 50 Supervisory Expert respondents with more than 15 years of experience were determined by purposive sampling. Data analysis through several stages, namely the initial stage of checking the validity of data reliability with SPSS, the next stage is determining the competencies that have a significant effect using Smart PLS v. 4.0. The results of the analysis obtained a significant relationship between Project Manager Competence (X1) and Infrastructure Project Performance (Y) with a t-statistic value of 6.399, p-value of 0.000, there are 13 sub-competencies, and Supervisory Expert Competence (X2) has a significant effect on Infrastructure Project Performance (Y) with a t-statistic value of 3.796, p-value of 0.000, there are 7 sub-competencies. Both have a significant influence on Infrastructure Project Performance in Indonesia.
References
Abdelmasseh, R. M., Bassioni, H. A., & Gaid, E. F. (2022). Project Manager Skills affecting Construction Projects in Egypt. IOP Conference Series: Earth and Environmental Science, 1056(1), 1–9. https://doi.org/10.1088/1755-1315/1056/1/012038
Ahmed, R. (2023). Project Performance Measures and Metrics Framework. 11–22. https://ideas.repec.org/h/elg/eechap/21291_2.html
Ashad, A. M., & Saraswati, R. A. (2022). Analisis Keberhasilan Proyek Terhadap Pengaruh Project Manager pada Pembangunan Guest House di Kota Parepare. Jurnal Teknik Sipil MACCA, 7(3), 198-205. https://doi.org/10.33096/s3ndpq48
For, G. (2025). Purposive Sampling : A Review And Guidelines For. 9(1), 1–23. https://doi.org/10.47263/JASEM.9(1)01
Hair Jr, J. F., Hult, G. T. M., Ringle, C. and Sarstedt, M. (2016). A primer on partial least squares structural equation modeling (PLS-SEM). Sage Publications. http://lccn.loc.gov/2016005380
International Federation of Consulting Engineers. (2017). FIDIC Silver Book: Conditions of Contract for EPC/Turnkey Projects. https://fidic.org/sites/default/files/EPC%20Turnkey%20Contract%20%28Second%20Edition%2C%202017%29%20amendments.pdf
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2014). Standar Kompetensi Kerja Nasional Indonesia (SKKNI) untuk Manajer Proyek. https://jdih.kemnaker.go.id/asset/data_puu/SKKNI%202014-031.pdf
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2015). Standar Kompetensi Kerja Nasional Indonesia (SKKNI) untuk Manajer Proyek. https://www.scribd.com/document/420864588/SKKNI-Nomor-108-Tahun-2015
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2020). Strategi Pembangunan Infrastruktur Indonesia. Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat. https://www.scribd.com/document/499891000/Buku-Renstra-Kementerian-PUPR-2020-2024-1
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2022). Standar Kompetensi Kerja Nasional Indonesia (SKKNI) Manajer Proyek. https://jdih.kemnaker.go.id/asset/data_puu/SKKNI%202022-049.pdf.pdf
Kementerian Pekerjaan Umum dan Perumahan Rakyat (2025), ICT No. 345 “Standar Kompetensi Kerja Nasional Indonesia” (SKKNI) untuk manajer proyek. https://www.scribd.com/document/933201417/SKKNI-2025-345-pdf
Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607–610. https://doi.org/10.1177/001316447003000308
Li, W. (2023). Application of Earned Value Management in Project Management. 0, 101–109. https://doi.org/10.54254/2754-1169/20/20230178
Mairizal. M., Alifiardi, R., Pratama, G. A., Zaimi, M., Majid, A., & Ngian, S. P. (2023). Project managers competency on project performance of green toll road development project in Indonesia. Sinergi 27(8), 333–342. http://doi.org/10.22441/sinergi.2023.3.005
Project Management Institute. (2021) A guide to the project management body ofknowledge (PMBOK®guide), Fifth edition. Project Management Institute – Pennsylvania https://www.scirp.org/reference/referencespapers?referenceid=3045567
Project Management Institute. (2017) Project manager competency development (PMCD) framework, edition 3rd, Project Management Institute, Pennsylvania. https://www.pmi.org/standards/pm-competency-development-third-edition
Rarasati, A. D., & Rahman, W. P. (2025). Indicators in the Performance Evaluation Rubric for Supervision Consultants in Toll Road Construction Projects. Journal La Multiapp, 6(5), 1126-1142. https://doi.org/10.37899/journallamultiapp.v6i5.2318
Rauzana, A., Akbar, M. H., & Dharma, W. (2022). The influence of project manager competencies on the success of construction projects: A case of Indonesia. Problems and Perspectives in Management, 20(4), 67. https://doi.org/10.21511/ppm.20(4).2022.06
Rustam, A., Yasin, M. N., Zainuddin, M., Yusoff, K. N., & Kamil, N. A. (2024). A Review on Dominant Factors of Project Manager Competency in Various Implementations for the Construction Industry. IOP Conference Series: Earth and Environmental Science, 1347(1). https://doi.org/10.1088/1755-1315/1347/1/012044
Sugiyono, (2018), Metode Penelitian Kuantitatif, Kulitataif dan Gabungan, ISBN 978-602-289-471-1, Penerbit: Alfabeta, Bandung.
Subekti, A., & Suhardi, D. (2022). Peran dan tugas konsultan supervisi pada proyek jalan dan jembatan pekerjaan umum dan perumahan rakyat. Jurnal Seminar Keinsinyuran 2021, 143–149. https://doi.org/10.22219/SKPSPPI.V3I1.6562
Sujaweni, V., Wiratna (2016), Kupas Tuntas Penelitian Akutansi dengan SPSS, ISBN 978-602-376-041-1, Penerbit: Pustaka Baru Press, Yogyakarta.
Surri, D. A., & Alfianto, I. (2025). Faktor Penyebab Keterlambatan Proyek Infrastruktur di Indonesia dan Strategi Manajemen : Studi Literatur. Journal of Sustainable Construction, 5(1), 25-34. https://doi.org/10.26593/josc.v5i1.9253
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms (Penulis yang mengajukan publikasi artikel telah menyetujui hal berikut):
- Through this publication, the author agree to submit the copyright of article writing to Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. This copyright submission takes the form of, but is not limited to: reproduction of the article and parts therein, including photographic reproductions; distribution of articles through printed and electronic documents; and translation of articles(Bahwa melalui publikasi ini, hak cipta penulisan artikel diserahkan kepada Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. Penyerahan hak cipta ini berupa, namun tidak terbatas pada: perbanyakan artikel dan bagian di dalamnya, termasuk reproduksi fotografi; penyebarluasan artikel melalui dokumen cetak dan elektronik; serta penterjemahan artikel).
- The authors agree to the terms of the Copyright Notice, according to Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License., which will apply to this article if and when it is published by Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil. (Para penulis setuju dengan ketentuan Pemberitahuan Hak Cipta, sesuai dengan Lisensi Internasional Creative Commons Attribution-NonCommercial-ShareAlike 4.0., yang akan berlaku untuk artikel ini jika dan ketika diterbitkan oleh Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil).

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

.png)











