Manajemen Risiko Kesehatan dan Keselamatan Kerja Menggunakan Metode HIRARC Pada Project Pembangunan Gedung Universitas Nahdlatul Ulama Yogyakarta

Authors

  • Vina Mardhatillah Universitas Nahdlatul Ulama Yogyakarta
  • Rifqi Syarif Nasrulloh Universitas Nahdlatul Ulama Yogyakarta
  • Suhada Universitas Nahdlatul Ulama Yogyakarta
  • Fahmy Akbar Idries Universitas Nahdlatul Ulama Yogyakarta

DOI:

https://doi.org/10.32832/jm-uika.v15i2.15188

Keywords:

OHS Risk Management, Risk Identification, HIRARC Method

Abstract

Work accidents can occur due to the actions of someone who does not comply with work safety, carelessness of workers, unsafe procedures. The purpose of this research is to compare the risk management plan implemented by the company with the results of the research that has been done. The research was conducted using a descriptive method that describes the identification and assessment of OSH risks. Retrieval of data regarding identification and risk assessment is analyzed with HIRARC (Hazard Identification Risk Assessment and Risk Control), evaluated and determined efforts to improve and control hazard risks in the workplace so that the workplace is safe. The results of this study are the results of a risk assessment in the early stages of identifying company risks, there are potential occurrences of 18 types of risks. However, through the results of further research in the risk identification process, there are a total of 23 types of risks identified in column formwork and work at height. Risk control efforts include the use of proper PPE as well as regular inspections on scaffolding. Some risks do not occur according to initial predictions, and some unexpected risks arise. Even so, preventive measures are still being implemented to minimize the impact that may occur.

Author Biographies

Vina Mardhatillah, Universitas Nahdlatul Ulama Yogyakarta

Program Studi Manajemen, Fakultas Ekonomi, Universitas Nahdlatul Ulama Yogyakarta, Indonesia

Rifqi Syarif Nasrulloh, Universitas Nahdlatul Ulama Yogyakarta

Program Studi Manajemen, Fakultas Ekonomi, Universitas Nahdlatul Ulama Yogyakarta, Indonesia

Suhada, Universitas Nahdlatul Ulama Yogyakarta

Program Studi Manajemen, Fakultas Ekonomi, Universitas Nahdlatul Ulama Yogyakarta, Indonesia

 

Fahmy Akbar Idries, Universitas Nahdlatul Ulama Yogyakarta

Program Studi Manajemen, Fakultas Ekonomi, Universitas Nahdlatul Ulama Yogyakarta, Indonesia

References

Alfatiyah, R., Surya Kencana No, J., & Selatan, T. (2017). Analisis Manajemen Risiko Keselamatan Dan Kesehatan Kerja Dengan Menggunakan Metode Hirarc Pada Pekerjaan Seksi Casting. Jurnal Mesin Teknologi (SINTEK Jurnal), 11(2), 88-101..

Ardianto, Y., & Riskarini, D. (2016). Pengendalian Internal Terhadap Deteksi Risiko Kecurangan dan Kinerja Perusahaan Daerah Air Minum. Jurnal Manajemen, 8(2), 151. https://doi.org/10.32832/jm-uika.v8i2.1114

Atkinson, P. (2007). Ethnography: Principles in practice. Routledge.

Fathimahhayati, L. D., Wardana, M. R., & Gumilar, N. A. (2019). Analisis Risiko K3 Dengan Metode HIRARC Pada Industri Tahu Dan Tempe Kelurahan Selili, Samarin-da. Jurnal Rekavasi, 7(1), 62 -70.

Fauziyah, S., Susanti, R., & Nurjihad, F. (2021). Risk assessment for occupational health and safety of Soekarno-Hatta international airport accessibility project through HIRARC method. IOP Conference Series: Earth and Environmental Science, 700(1), 012048. https://doi.org/10.1088/1755-1315/700/1/012048

Giovanni, A., Fathimahhayati, L. D., & Pawitra, T. A. (2023). Risk Analysis of Occupational Health and Safety Using Hazard Identification, Risk Assessment and Risk Control (HIRARC) Method (Case Study in PT Barokah Galangan Perkasa). IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(2), 198. https://doi.org/10.22441/ijiem.v4i2.20398

Hardianta, C., Effendy, M., Person, K., & Tlogomas, J. R. (2021). Penjadwalan Proyek Dengan Kurva S Berbasis Tenaga Kerja Pada Proyek Pembangunan Perumahan. Seminar Keinsinyuran. (Vol. 1, No. 2)

Kurniawidjaja, L. M. (2007). Filosofi dan konsep dasar kesehatan kerja serta perkem-bangannya dalam praktik. Kesmas: Jurnal Kesehatan Masyarakat Nasional (National Public Health Journal), 1(6), 243-251.

Kvale, S. (2015). InterViews: An introduction to qualitative research interviewing. Sage Pub-lications.

Ningsih, S. O. D., & Hati, S. W. (2019). Analisis Resiko Keselamatan Dan Kesehatan Kerja (K3) Dengan Menggunakan Metode Hazard and Operability Study (Hazop) Pada Bagian Hy-drotest Manual Di Pt. Cladtek Bi Metal Manufacturing. Journal of Applied Business Admin-istration, 3(1), 29–39.

Podungge, M. R., Wimala, M., & Soekiman, A. (2019). Pendekatan Holistik dalam Men-gidentifikasi Kendala Implementasi Green Construction di Indonesia. (Hal. 1-12). RekaRa-cana: Jurnal Teknil Sipil, 5(2), 1. https://doi.org/10.26760/rekaracana.v5i2.1

Prastowo, A. (2012). Metode penelitian kualitatif dalam perspektif rancangan penelitian. AR-RUZZ MEDIA

Putra, R. D., Sukandari, B., & Wihartono, W. (2019). Risk Management Of Occupational Safety And Health In Kri Docking Project Using Hazard Identification, Risk Assessment And Risk Control (HIRARC) Method Case Study: PT. PAL INDONESIA. JOURNAL ASRO, 10(2), 76. https://doi.org/10.37875/asro.v10i2.131

Rahmah, G. M. (2019). Analisis manajemen risiko penerapan sistem informasi di politeknik stmi Jakarta. JURNAL TEKNOLOGI dan MANAJEMEN, 17(2), 65-77.

Ramadhan, F., (2017). Analisis Kesehatan dan Keselamatan Kerja (K3) Menggunakan Haz-ard Identification Risk Assessment and Risk Control (HIRARC). In Prosiding Seminar Na-sional Riset Terapan| SENASSET (pp. 164-169).

Saputro, D., & Nasrulloh, R. S. (2023). Risk Management, Disaster Mitigation in the Uni-versity Environment. Jurnal Perencanaan Pembangunan: The Indonesian Journal of Devel-opment Planning, 7(3), 375-388.

Sebastianus, B. H. (2015). Manajemen Keselamatan dan Kesehatan Kerja sebagai Peranan Pencegahan Kecelakaan Kerja di Bidang Konstruksi. Seminar Nasional Teknik Sipil V.

Siska, M. (2018). Analisis 5s dan Hirarc Pada Stasiun Kerja Rotary, Dryer dan Veneer Compouser di PT. Asia Forestama Raya Pekanbaru. Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, 4(1), 21.

Sulistyaningtyas, N., Naiem, M. F., & Syafar, M. (2020). Manajemen Risiko Kecelakaan Kerja Pada Karyawan Pt Pelabuhan Indonesia IV (Persero) Cabang Makassar. Jurnal Kesehatan Masyarakat Maritim, 3(1)

Supriyadi, S., Nalhadi, A., & Rizaal, A. (2015). Identifikasi Bahaya dan Penilaian Risiko K3 pada Tindakan Perawatan & Perbaikan Menggunakan Metode HIRARC (Hazard Identifica-tion and Risk Assesment Risk Control) pada PT. X. PROSIDING SEMINAR NASIONAL RISET TERAPAN 2015, 281–286.

Trianda. (2022). Analisis Konsep Nilai Hasil (Earned Value Concept) Pada Monitoring Proyek Pekerjaan Konstruksi Pembangunan Gedung Parkir Mesjid Agung (STUDI KASUS).

Triswandana, E. (2020). Penilaian Risiko K3 dengan Metode HIRARC. UKaRsT, 4(1). https://doi.org/10.30737/ukarst.v4i1.788

Zalk, D. M., Kamerzell, R., Paik, S., Kapp, J., Harrington, D., & Swuste, P. (2010). Risk Level Based Management System: A Control Banding Model for Occupational Health and Safety Risk Management in a Highly Regulated Environment. Industrial Health, 48(1), 18–28. https://doi.org/10.2486/indhealth.48.18

Downloads

Published

08-06-2023

How to Cite

Mardhatillah, V., Nasrulloh, R. S., Suhada, & Idries, F. A. (2023). Manajemen Risiko Kesehatan dan Keselamatan Kerja Menggunakan Metode HIRARC Pada Project Pembangunan Gedung Universitas Nahdlatul Ulama Yogyakarta. Jurnal Manajemen (Edisi Elektronik), 15(2), 439–454. https://doi.org/10.32832/jm-uika.v15i2.15188