Journal History |
Editorial Board |
Review |
Focus and Scope |
Publication Ethics |
Author Guidelines |
Online Submissions |
Publication Fee |
Contact |
Vol. 7 No. 1 (2023)

This issue has been available online since February 6th, 2023, for the regular issue of February - July 2023. All Articles in this issue were authored/co-authored by 53 Authors from eight Universities (Universitas Muhammadiyah Aceh, Universitas Ibn Khaldun Bogor, Universitas Pembangunan Nasional Veteran Jawa Timur, Institut Teknologi Al-Kamal, Universitas Muhammadiyah Tasikmalaya, Universitas Pembangunan Jaya, Universitas Kadiri, and Universitas Bung Hatta).
Articles
-
Pemilihan Metode Pembayaran Menggunakan Termin dan Turnkey pada Proyek Kontruksi di Banda Aceh
-
This article have been read 511 times, downloaded 4187 times PDF (Bahasa Indonesia)
-
-
Analisis Stabilitas Dan Biaya Perencanaan Dinding Penahan Tanah Tipe Bronjong di Sungai Ciliwung (Studi Kasus: Ruas Legok Nyenang Rt.01/03, Desa Leuwimalang, Kecamatan Cisarua, Kabupaten Bogor)
-
This article have been read 888 times, downloaded 1008 times PDF (Bahasa Indonesia)
-
-
Efektifitas Polisi Tidur (Road Humps) dalam Mereduksi Kecepatan pada Ruas Jalan H.M. Syarifudin di Kota Bogor
-
This article have been read 793 times, downloaded 956 times PDF (Bahasa Indonesia)
-
-
Pengolahan Air Limbah untuk Pemanfaatan Penyiraman Tanaman di Rumah Sakit Y Kabupaten Tuban
-
This article have been read 5657 times, downloaded 8004 times PDF (Bahasa Indonesia)
-
-
Perencanaan MCK dan Septic Tank Komunal di Desa Weninggalih, Kecamatan Jonggol, Kabupaten Bogor
-
This article have been read 614 times, downloaded 483 times PDF (Bahasa Indonesia)
-
-
Analisis Tebal Perkerasan Jalan dengan Metode AASHTO terhadap Kerusakan Ruas Jalan Cileungsi – Cinyongsong Udik, Kabupaten Bogor
-
This article have been read 763 times, downloaded 1452 times PDF (Bahasa Indonesia)
-
-
Multi-Criteria Analysis Method For Determining The Priority of Bridge Construction
-
This article have been read 173 times, downloaded 165 times PDF
-
-
Evaluasi Kinerja Angkutan Umum Trans Pakuan Trayek Terminal Bubulak via Cidangiang – Ciawi di Kota Bogor
-
This article have been read 1023 times, downloaded 890 times PDF (Bahasa Indonesia)
-
-
Perencanaan Sistem Drainase dengan Metode Sumur Resapan di Masjid Al Hijri II, Universitas Ibn Khaldun Bogor
-
This article have been read 706 times, downloaded 626 times PDF (Bahasa Indonesia)
-
-
Metode Pelaksanaan dan Analisa Efisiensi Pekerjaan Aluminium Formwork System pada Proyek Apartemen Sudimara Forestwalk Tower Albizia
-
This article have been read 438 times, downloaded 556 times PDF (Bahasa Indonesia)
-
-
Peningkatan Jalan Menggunakan Perkerasan Kaku (Rigid Pavement) pada Ruas Jalan Letnan Sukarna Kecamatan Ciampea Kabupaten Bogor
-
This article have been read 442 times, downloaded 350 times PDF (Bahasa Indonesia)
-
-
Penentuan Karakteristik Tanah Desa Ngasem dengan Metode ASTM
-
This article have been read 406 times, downloaded 341 times PDF (Bahasa Indonesia)
-
-
Transformasi Stadion Olah Raga KONI di Kawasan Perdagangan Kota Jambi
-
This article have been read 174 times, downloaded 186 times PDF (Bahasa Indonesia)
-
-
Perhitungan Kebutuhan Air Irigasi untuk Perluasan Daerah Irigasi (Studi Kasus: Daerah Irigasi Cisadeng II, Desa Leuwisadeng, Kecamatan Leuwisadeng, Kabupaten Bogor)
-
This article have been read 337 times, downloaded 981 times PDF (Bahasa Indonesia)
-
-
Efektifitas Pita Penggaduh (Rumble Strips) dalam Mereduksi Kecepatan pada Ruas Jalan Achmad Adnawijaya Kota Bogor
-
This article have been read 279 times, downloaded 294 times pdf (Bahasa Indonesia)
-