| Editorial Board |
| Review |
| Focus and Scope |
| Publication Ethics |
| Author Guidelines |
| Online Submissions |
| Publication Fee |
| Contact |
Vol 7 No 2 (2023)
This issue has been available online since August 1st, 2023, for the regular issue of August 2023 - January 2024. All Articles in this issue were authored/co-authored by 64 Authors from thirteen Universities (Universitas Pembangunan Nasional Veteran Jawa Timur, Universitas Ibn Khaldun Bogor, Universitas Muhammadiyah Surakarta, Universitas Pembangunan Jaya, Universitas Jambi, Politeknik Negeri Cilacap, Universitas Malahayati, Institut Teknologi Bandung, Universitas Muhammadiyah Palangka Raya, Universitas Samudra, Institut Teknologi Kalimantan, Universitas Internasional Batam, and Universitas Tanri Abeng).
Articles
-
Pemanfaatan Limbah Cair Terolah untuk Penyiraman dan Flushing Toilet (Studi Kasus: Rumah Sakit X, Kota Batu, Jawa Timur)
-
This article have been
read 1396 times,
downloaded 2687 times
pdf
-
-
Studi Perbandingan Daya Dukung Aksial Tiang Pancang Tunggal Persegi Berdasarkan Hasil Uji Pembebanan Statik (SLT) dan Uji PDA pada Pembangunan Apartemen Loftville City Kota Tangerang Selatan
-
This article have been
read 560 times,
downloaded 524 times
pdf
-
-
Kajian Tampungan Kapasitas Hulu Bendung Karet Tirtonadi pada Penanganan Banjir Kota Surakarta Paket – 3
-
This article have been
read 378 times,
downloaded 477 times
PDF
-
-
Perbandingan Penurunan Elastis Fondasi Tiang Pancang dengan Menggunakan Metode Analitis dan Metode Elemen Hingga
-
This article have been
read 372 times,
downloaded 830 times
pdf (English)
-
-
Perencanaan Tebal Perkerasan Kaku pada Ruas Jalan Lingkar Laladon, Kabupaten Bogor
-
This article have been
read 511 times,
downloaded 326 times
pdf
-
-
Analisis Kekuatan AC-WC Bahan Fly Ash Batu Bara sebagai Pengganti Abu Batu dengan Metode Marshall
-
This article have been
read 374 times,
downloaded 359 times
pdf (English)
-
-
Desain Alternatif Struktur Talang Air Beton pada Saluran Sugih, Desa Cibedug, Kecamatan Ciawi
-
This article have been
read 290 times,
downloaded 266 times
pdf (English)
-
-
Perancangan Instalasi Pengolahan Air Limbah (IPAL) Komunal di Perumahan Green Hills Recidence, Cilacap Utara, Cilacap
-
This article have been
read 763 times,
downloaded 1391 times
pdf
-
-
Penerapan Sketchup dalam Perhitungan Rencana Anggaran Biaya sebagai Pendekatan BIM pada Pembangunan Rumah Tipe 45
-
This article have been
read 565 times,
downloaded 578 times
pdf
-
-
Peningkatan Penggunaan Moda Non-Motorized Transport dengan Stated Preference pada Pelajar Sekolah Menengah Negeri Jakarta Pusat
-
This article have been
read 430 times,
downloaded 436 times
pdf
-
-
Analisis Stabilitas Dinding Penahan Tanah Saluran Irigasi Situ Bala, Desa Purwasari, Kecamatan Dramaga, Kabupaten Bogor
-
This article have been
read 742 times,
downloaded 573 times
pdf
-
-
Analisis Kualitas Pelayanan Stasiun Kereta Api Berdasarkan Tingkat Kepuasan Pengguna Layanan (Studi Kasus: Stasiun Tanjung Karang)
-
This article have been
read 392 times,
downloaded 976 times
pdf
-
-
Pengaruh Perkuatan Kolom Pasir terhadap Kekuatan Tanah Lempung
-
This article have been
read 466 times,
downloaded 295 times
pdf
-
-
Studi Penataan Kawasan Simpang Ciawi sebagai Simpul Transportasi
-
This article have been
read 349 times,
downloaded 354 times
pdf
-
-
Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu
-
This article have been
read 1343 times,
downloaded 2040 times
pdf
-
-
Pemilihan Antara 2 Moda Feeder Kereta Cepat Jakarta Bandung dari Stasiun Padalarang
-
This article have been
read 508 times,
downloaded 566 times
pdf
-
-
Analisis Penilaian Komponen Bangunan Gedung terhadap Pemeliharaan Ruang Kelas SMK Negeri 3 Balikpapan
-
This article have been
read 532 times,
downloaded 459 times
pdf
-
-
Efektifitas Pita Penggaduh (Rumble Strips) dalam Mereduksi Kecepatan pada Ruas Jalan Siliwangi di Kota Bogor
-
This article have been
read 678 times,
downloaded 357 times
pdf
-
-
Perencanaan Jetty di Pantai Bahagia Batam sebagai Upaya Pencegahan Abrasi Pantai
-
This article have been
read 1221 times,
downloaded 1051 times
pdf
-
-
Analisis Faktor yang Mempengaruhi Penerapan K3 (Keselamatan dan Kesehatan Kerja) Konstruksi Pembangunan Gedung Resto Apung Muara Angke
-
This article have been
read 1615 times,
downloaded 1428 times
pdf
-

.png)










