| Editorial Board |
| Review |
| Focus and Scope |
| Publication Ethics |
| Author Guidelines |
| Online Submissions |
| Publication Fee |
| Contact |
Vol 7 No 2 (2023)
This issue has been available online since August 1st, 2023, for the regular issue of August 2023 - January 2024. All Articles in this issue were authored/co-authored by 64 Authors from thirteen Universities (Universitas Pembangunan Nasional Veteran Jawa Timur, Universitas Ibn Khaldun Bogor, Universitas Muhammadiyah Surakarta, Universitas Pembangunan Jaya, Universitas Jambi, Politeknik Negeri Cilacap, Universitas Malahayati, Institut Teknologi Bandung, Universitas Muhammadiyah Palangka Raya, Universitas Samudra, Institut Teknologi Kalimantan, Universitas Internasional Batam, and Universitas Tanri Abeng).
Articles
-
Pemanfaatan Limbah Cair Terolah untuk Penyiraman dan Flushing Toilet (Studi Kasus: Rumah Sakit X, Kota Batu, Jawa Timur)
-
This article have been
read 1503 times,
downloaded 2777 times
pdf
-
-
Studi Perbandingan Daya Dukung Aksial Tiang Pancang Tunggal Persegi Berdasarkan Hasil Uji Pembebanan Statik (SLT) dan Uji PDA pada Pembangunan Apartemen Loftville City Kota Tangerang Selatan
-
This article have been
read 588 times,
downloaded 577 times
pdf
-
-
Kajian Tampungan Kapasitas Hulu Bendung Karet Tirtonadi pada Penanganan Banjir Kota Surakarta Paket – 3
-
This article have been
read 402 times,
downloaded 506 times
PDF
-
-
Perbandingan Penurunan Elastis Fondasi Tiang Pancang dengan Menggunakan Metode Analitis dan Metode Elemen Hingga
-
This article have been
read 478 times,
downloaded 922 times
pdf (English)
-
-
Perencanaan Tebal Perkerasan Kaku pada Ruas Jalan Lingkar Laladon, Kabupaten Bogor
-
This article have been
read 571 times,
downloaded 369 times
pdf
-
-
Analisis Kekuatan AC-WC Bahan Fly Ash Batu Bara sebagai Pengganti Abu Batu dengan Metode Marshall
-
This article have been
read 406 times,
downloaded 458 times
pdf (English)
-
-
Desain Alternatif Struktur Talang Air Beton pada Saluran Sugih, Desa Cibedug, Kecamatan Ciawi
-
This article have been
read 329 times,
downloaded 291 times
pdf (English)
-
-
Perancangan Instalasi Pengolahan Air Limbah (IPAL) Komunal di Perumahan Green Hills Recidence, Cilacap Utara, Cilacap
-
This article have been
read 850 times,
downloaded 1451 times
pdf
-
-
Penerapan Sketchup dalam Perhitungan Rencana Anggaran Biaya sebagai Pendekatan BIM pada Pembangunan Rumah Tipe 45
-
This article have been
read 606 times,
downloaded 606 times
pdf
-
-
Peningkatan Penggunaan Moda Non-Motorized Transport dengan Stated Preference pada Pelajar Sekolah Menengah Negeri Jakarta Pusat
-
This article have been
read 494 times,
downloaded 494 times
pdf
-
-
Analisis Stabilitas Dinding Penahan Tanah Saluran Irigasi Situ Bala, Desa Purwasari, Kecamatan Dramaga, Kabupaten Bogor
-
This article have been
read 789 times,
downloaded 620 times
pdf
-
-
Analisis Kualitas Pelayanan Stasiun Kereta Api Berdasarkan Tingkat Kepuasan Pengguna Layanan (Studi Kasus: Stasiun Tanjung Karang)
-
This article have been
read 413 times,
downloaded 999 times
pdf
-
-
Pengaruh Perkuatan Kolom Pasir terhadap Kekuatan Tanah Lempung
-
This article have been
read 511 times,
downloaded 342 times
pdf
-
-
Studi Penataan Kawasan Simpang Ciawi sebagai Simpul Transportasi
-
This article have been
read 375 times,
downloaded 374 times
pdf
-
-
Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu
-
This article have been
read 1436 times,
downloaded 2304 times
pdf
-
-
Pemilihan Antara 2 Moda Feeder Kereta Cepat Jakarta Bandung dari Stasiun Padalarang
-
This article have been
read 548 times,
downloaded 589 times
pdf
-
-
Analisis Penilaian Komponen Bangunan Gedung terhadap Pemeliharaan Ruang Kelas SMK Negeri 3 Balikpapan
-
This article have been
read 604 times,
downloaded 491 times
pdf
-
-
Efektifitas Pita Penggaduh (Rumble Strips) dalam Mereduksi Kecepatan pada Ruas Jalan Siliwangi di Kota Bogor
-
This article have been
read 702 times,
downloaded 388 times
pdf
-
-
Perencanaan Jetty di Pantai Bahagia Batam sebagai Upaya Pencegahan Abrasi Pantai
-
This article have been
read 1258 times,
downloaded 1082 times
pdf
-
-
Analisis Faktor yang Mempengaruhi Penerapan K3 (Keselamatan dan Kesehatan Kerja) Konstruksi Pembangunan Gedung Resto Apung Muara Angke
-
This article have been
read 1703 times,
downloaded 1524 times
pdf
-

.png)












